Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1985 |
Principal Product | ADHESIVES,HYDRAULIC OILS |
NAICS | n/a |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,800,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $50,101 | 759,965 | kWh | $0.07 |
Natural Gas | $34,794 | 6,936 | MMBtu | $5.02 |
TOTAL ENERGY COSTS | $84,895 | |||
RECOMMENDED SAVINGS* | $22,281 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,023 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,997 Cost: $11,570 |
$15,997 | 242,673 | - | - | - | - |
$15,997 242,673 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $2,304 Cost: $1,000 |
- | - | $2,304 | 459 | - | - |
- - kWh |
$2,304 459 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $793 Cost: $628 |
- | - | $793 | 158 | - | - |
- - kWh |
$793 158 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $734 Cost: $250 |
$734 | 11,137 | - | - | - | - |
$734 11,137 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $171 Cost: $400 |
- | - | $171 | 34 | - | - |
- - kWh |
$171 34 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $599 Cost: - |
- | - | $1,099 | 219 | $(-500) | - |
- - kWh |
$1,099 219 MMBtu |
$(-500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $427 Cost: $400 |
- | - | $427 | 85 | - | - |
- - kWh |
$427 85 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2164 TURN OFF STEAM TRACING DURING MILD WEATHER |
Savings: $442 Cost: - |
- | - | $422 | 84 | $20 | - |
- - kWh |
$422 84 MMBtu |
$20 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $328 Cost: $50 |
$328 | 4,982 | - | - | - | - |
$328 4,982 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $196 Cost: $157 |
- | - | $196 | 39 | - | - |
- - kWh |
$196 39 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $174 Cost: $300 |
$174 | 2,638 | - | - | - | - |
$174 2,638 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $116 Cost: $200 |
$116 | 1,758 | - | - | - | - |
$116 1,758 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,281 Cost: $14,955 |
$17,349 | 263,188 | $5,412 | 1,078 | $(-480) | - | $17,349 263,188 kWh |
$5,412 1,078 MMBtu |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,023 Cost: $1,850 |
$850 | 12,895 | $3,153 | 628 | $20 | - | $850 12,895 kWh |
$3,153 628 MMBtu |
$20 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |