IAC Assessment: KU0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product HEAVY DUTY TUCK TRANSMISSIONS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 473
Plant Area (Sq.Ft.) 0
Annual Production 42,000 Pieces
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $903,114 18,716,003 kWh $0.05
Natural Gas $353,943 76,412 MMBtu $4.63
TOTAL ENERGY COSTS $1,257,057
RECOMMENDED SAVINGS* $102,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,007
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$35,188
Cost:
$27,000
- - $35,188 7,600 - - -
-
kWh
$35,188
7,600
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,000
Cost:
$30,000
$18,000 - - - - - $18,000
-
kWh
-
-
MMBtu
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$11,057
Cost:
$5,000
$11,057 229,191 - - - - $11,057
229,191
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$9,940
Cost:
$10,352
$9,940 206,038 - - - - $9,940
206,038
kWh
-
-
MMBtu
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,125
Cost:
$6,000
$8,125 - - - - - $8,125
-
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,890
Cost:
$5,585
$7,890 163,540 - - - - $7,890
163,540
kWh
-
-
MMBtu
-
-
$
07: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$3,369
Cost:
$4,000
- - $569 123 $2,800 - -
-
kWh
$569
123
MMBtu
$2,800
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,559
Cost:
$525
$2,559 53,048 - - - - $2,559
53,048
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,489
Cost:
$315
$2,489 51,583 - - - - $2,489
51,583
kWh
-
-
MMBtu
-
-
$
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,750
Cost:
$3,236
- - $1,750 378 - - -
-
kWh
$1,750
378
MMBtu
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,456
Cost:
-
$1,456 30,188 - - - - $1,456
30,188
kWh
-
-
MMBtu
-
-
$
12: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$990
Cost:
-
$990 20,516 - - - - $990
20,516
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$102,813
Cost:
$92,013
$62,506 754,104 $37,507 8,101 $2,800 - $62,506
754,104
kWh
$37,507
8,101
MMBtu
$2,800
-
$
TOTAL IMPLEMENTED Savings:
$32,007
Cost:
$16,900
$32,007 495,018 - - - - $32,007
495,018
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes