Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1988 |
Principal Product | INDUSTRIAL FANS |
NAICS | n/a |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $163,683 | 2,069,168 | kWh | $0.08 |
Natural Gas | $90,915 | 24,260 | MMBtu | $3.75 |
TOTAL ENERGY COSTS | $254,598 | |||
RECOMMENDED SAVINGS* | $23,890 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,183 Cost: $6,000 |
$1,183 | 14,947 | - | - | - | - |
$1,183 14,947 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5194 REDESIGN PROCESS |
Savings: $4,705 Cost: $2,080 |
$185 | 2,345 | - | - | $4,520 | - |
$185 2,345 kWh |
- - MMBtu |
$4,520 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,538 Cost: $4,920 |
- | - | $2,538 | 677 | - | - |
- - kWh |
$2,538 677 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $1,965 Cost: $3,600 |
- | - | $1,965 | 524 | - | - |
- - kWh |
$1,965 524 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.5194 REDESIGN PROCESS |
Savings: $1,692 Cost: $1,200 |
$1,692 | 21,395 | - | - | - | - |
$1,692 21,395 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $1,519 Cost: $1,800 |
- | - | $1,519 | 405 | - | - |
- - kWh |
$1,519 405 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,236 Cost: $1,500 |
$(-69) | (-879) | $1,305 | 348 | - | - |
$(-69) (-879) kWh |
$1,305 348 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $928 Cost: - |
- | - | $1,328 | 354 | $(-400) | - |
- - kWh |
$1,328 354 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $788 Cost: - |
$788 | 9,965 | - | - | - | - |
$788 9,965 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $487 Cost: $500 |
$487 | 6,155 | - | - | - | - |
$487 6,155 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $107 Cost: - |
$70 | 879 | $37 | 10 | - | - |
$70 879 kWh |
$37 10 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $6,742 Cost: $11,500 |
- | - | $6,742 | 1,798 | - | - |
- - kWh |
$6,742 1,798 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,890 Cost: $33,100 |
$4,336 | 54,807 | $15,434 | 4,116 | $4,120 | - | $4,336 54,807 kWh |
$15,434 4,116 MMBtu |
$4,120 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,130 Cost: $15,480 |
$1,856 | 23,447 | $6,154 | 1,641 | $4,120 | - | $1,856 23,447 kWh |
$6,154 1,641 MMBtu |
$4,120 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||