IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product INDUSTRIAL FANS
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Pieces
Production Hrs. Annual 3,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,683 2,069,168 kWh $0.08
Natural Gas $90,915 24,260 MMBtu $3.75
TOTAL ENERGY COSTS $254,598
RECOMMENDED SAVINGS* $23,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,130
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,183
Cost:
$6,000
$1,183 14,947 - - - - $1,183
14,947
kWh
-
-
MMBtu
-
-
$
02: 2.5194 REDESIGN PROCESS Savings:
$4,705
Cost:
$2,080
$185 2,345 - - $4,520 - $185
2,345
kWh
-
-
MMBtu
$4,520
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,538
Cost:
$4,920
- - $2,538 677 - - -
-
kWh
$2,538
677
MMBtu
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,965
Cost:
$3,600
- - $1,965 524 - - -
-
kWh
$1,965
524
MMBtu
-
-
$
05: 2.5194 REDESIGN PROCESS Savings:
$1,692
Cost:
$1,200
$1,692 21,395 - - - - $1,692
21,395
kWh
-
-
MMBtu
-
-
$
06: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,519
Cost:
$1,800
- - $1,519 405 - - -
-
kWh
$1,519
405
MMBtu
-
-
$
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,236
Cost:
$1,500
$(-69) (-879) $1,305 348 - - $(-69)
(-879)
kWh
$1,305
348
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$928
Cost:
-
- - $1,328 354 $(-400) - -
-
kWh
$1,328
354
MMBtu
$(-400)
-
$
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$788
Cost:
-
$788 9,965 - - - - $788
9,965
kWh
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$487
Cost:
$500
$487 6,155 - - - - $487
6,155
kWh
-
-
MMBtu
-
-
$
11: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$107
Cost:
-
$70 879 $37 10 - - $70
879
kWh
$37
10
MMBtu
-
-
$
12: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$6,742
Cost:
$11,500
- - $6,742 1,798 - - -
-
kWh
$6,742
1,798
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,890
Cost:
$33,100
$4,336 54,807 $15,434 4,116 $4,120 - $4,336
54,807
kWh
$15,434
4,116
MMBtu
$4,120
-
$
TOTAL IMPLEMENTED Savings:
$12,130
Cost:
$15,480
$1,856 23,447 $6,154 1,641 $4,120 - $1,856
23,447
kWh
$6,154
1,641
MMBtu
$4,120
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes