IAC logo
IAC Assessment: KU0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1988
Principal Product HEADLIGHT AIMING EQUIPMENT
NAICS n/a
SIC 3647 - Vehicular Lighting Equipment
Sales $10,000,000-$50,000,000
# of Employees 195
Plant Area (Sq.Ft.) 0
Annual Production 6,500,000 Pieces
Production Hrs. Annual 4,318
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,288 2,625,147 kWh $0.05
Natural Gas $6,177 1,754 MMBtu $3.52
TOTAL ENERGY COSTS $142,465
RECOMMENDED SAVINGS* $12,174 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,383
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,686
Cost:
$1,650
$2,686 51,583 - - - - $2,686
51,583
kWh
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,577
Cost:
$800
- - $2,577 732 - - -
-
kWh
$2,577
732
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,601
Cost:
$300
$2,601 50,117 - - - - $2,601
50,117
kWh
-
-
MMBtu
-
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,886
Cost:
$3,600
$1,886 36,342 - - - - $1,886
36,342
kWh
-
-
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,278
Cost:
-
$1,778 - - - $(-500) - $1,778
-
kWh
-
-
MMBtu
$(-500)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$791
Cost:
$200
$791 15,240 - - - - $791
15,240
kWh
-
-
MMBtu
-
-
$
07: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$239
Cost:
$200
- - $239 68 - - -
-
kWh
$239
68
MMBtu
-
-
$
08: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$116
Cost:
-
$46 879 $70 20 - - $46
879
kWh
$70
20
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,174
Cost:
$6,750
$9,788 154,161 $2,886 820 $(-500) - $9,788
154,161
kWh
$2,886
820
MMBtu
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$11,383
Cost:
$6,550
$8,997 138,921 $2,886 820 $(-500) - $8,997
138,921
kWh
$2,886
820
MMBtu
$(-500)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes