Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1988 |
Principal Product | ENVELOPES |
NAICS | n/a |
SIC | 2677 - Envelopes |
Sales | $5,000,000-$10,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 590,778,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,114 | 2,145,076 | kWh | $0.05 |
Natural Gas | $10,560 | 2,870 | MMBtu | $3.68 |
Other Energy | $3,470 | 482 | MMBtu | $7.20 |
TOTAL ENERGY COSTS | $111,144 | |||
RECOMMENDED SAVINGS* | $8,015 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,109 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,737 Cost: $5,000 |
$1,737 | 38,394 | - | - | - | - | - | - |
$1,737 38,394 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $2,188 Cost: $4,000 |
$2,188 | 48,359 | - | - | - | - | - | - |
$2,188 48,359 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,211 Cost: $1,600 |
- | - | $1,211 | 329 | - | - | - | - |
- - kWh |
$1,211 329 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,486 Cost: $1,308 |
$1,486 | 32,825 | - | - | - | - | - | - |
$1,486 32,825 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $219 Cost: - |
- | - | $519 | 141 | - | - | $(-300) | - |
- - kWh |
$519 141 MMBtu |
- - MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $187 Cost: - |
- | - | $217 | 59 | - | - | $(-30) | - |
- - kWh |
$217 59 MMBtu |
- - MMBtu |
$(-30) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $269 Cost: - |
- | - | $269 | 73 | - | - | - | - |
- - kWh |
$269 73 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $108 Cost: - |
- | - | - | - | $108 | 15 | - | - |
- - kWh |
- - MMBtu |
$108 15 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $610 Cost: $920 |
$610 | 13,482 | - | - | - | - | - | - |
$610 13,482 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,015 Cost: $12,828 |
$6,021 | 133,060 | $2,216 | 602 | $108 | 15 | $(-330) | - | $6,021 133,060 kWh |
$2,216 602 MMBtu |
$108 15 MMBtu |
$(-330) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,109 Cost: $7,908 |
$3,223 | 71,219 | $2,216 | 602 | - | - | $(-330) | - | $3,223 71,219 kWh |
$2,216 602 MMBtu |
- - MMBtu |
$(-330) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes |