Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1989 |
Principal Product | FOOD PROCESSING EQUIPMENT |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 3,000 Pieces |
Production Hrs. Annual | 4,930 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,457 | 830,891 | kWh | $0.08 |
Natural Gas | $15,686 | 3,880 | MMBtu | $4.04 |
TOTAL ENERGY COSTS | $79,143 | |||
RECOMMENDED SAVINGS* | $14,963 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,528 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $582 Cost: $1,068 |
$582 | 7,620 | - | - | - | - |
$582 7,620 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,256 Cost: $3,800 |
$605 | 7,913 | $901 | 223 | $750 | - |
$605 7,913 kWh |
$901 223 MMBtu |
$750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $2,145 Cost: $400 |
$493 | 6,448 | $1,652 | 409 | - | - |
$493 6,448 kWh |
$1,652 409 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,836 Cost: $100 |
$1,836 | 24,033 | - | - | - | - |
$1,836 24,033 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,101 Cost: $270 |
$2,101 | 27,550 | - | - | - | - |
$2,101 27,550 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,179 Cost: $3,864 |
$3,179 | 41,618 | - | - | - | - |
$3,179 41,618 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $204 Cost: - |
$67 | 879 | $137 | 34 | - | - |
$67 879 kWh |
$137 34 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $716 Cost: - |
$716 | 9,379 | - | - | - | - |
$716 9,379 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH |
Savings: $349 Cost: $358 |
- | - | $349 | 86 | - | - |
- - kWh |
$349 86 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $343 Cost: - |
- | - | $743 | 184 | $(-400) | - |
- - kWh |
$743 184 MMBtu |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,252 Cost: $700 |
$448 | 5,862 | $804 | 199 | - | - |
$448 5,862 kWh |
$804 199 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,963 Cost: $10,560 |
$10,027 | 131,302 | $4,586 | 1,135 | $350 | - | $10,027 131,302 kWh |
$4,586 1,135 MMBtu |
$350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,528 Cost: $6,660 |
$7,586 | 99,356 | $2,942 | 728 | - | - | $7,586 99,356 kWh |
$2,942 728 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |