Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1989
Principal Product PRINTED LABELS
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,200
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,282 1,601,993 kWh $0.05
Natural Gas $13,132 3,401 MMBtu $3.86
TOTAL ENERGY COSTS $89,414
RECOMMENDED SAVINGS* $18,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $886
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$935
Cost:
$462
$240 4,982 $695 180 - - $240
4,982
kWh
$695
180
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,133
Cost:
$1,133
$1,133 23,740 - - - - $1,133
23,740
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$187
Cost:
-
$187 3,810 - - - - $187
3,810
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$167
Cost:
-
$167 3,517 - - - - $167
3,517
kWh
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$291
Cost:
$350
$291 6,155 - - - - $291
6,155
kWh
-
-
MMBtu
-
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,986
Cost:
$4,440
$1,986 41,618 - - - - $1,986
41,618
kWh
-
-
MMBtu
-
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$318
Cost:
-
- - - - $318 - -
-
kWh
-
-
MMBtu
$318
-
$
08: 2.5194 REDESIGN PROCESS Savings:
$11,461
Cost:
$13,200
$9,025 189,625 - - $2,436 - $9,025
189,625
kWh
-
-
MMBtu
$2,436
-
$
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$241
Cost:
-
$192 4,103 $49 13 - - $192
4,103
kWh
$49
13
MMBtu
-
-
$
10: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,395
Cost:
$2,300
$1,395 29,308 - - - - $1,395
29,308
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,114
Cost:
$21,885
$14,616 306,858 $744 193 $2,754 - $14,616
306,858
kWh
$744
193
MMBtu
$2,754
-
$
TOTAL IMPLEMENTED Savings:
$886
Cost:
$350
$837 17,585 $49 13 - - $837
17,585
kWh
$49
13
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes