IAC logo
IAC Assessment: KU0321
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0321
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product METAL CONTAINERS
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 15,000 Pieces
Production Hrs. Annual 4,165
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,142 3,259,965 kWh $0.05
Natural Gas $77,791 20,672 MMBtu $3.76
TOTAL ENERGY COSTS $229,933
RECOMMENDED SAVINGS* $32,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,313
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$17,845
Cost:
$10,000
- - $17,845 - - - -
-
kWh
$17,845
-
MMBtu
-
-
$
02: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$8,554
Cost:
$10,000
- - - - $8,554 - -
-
kWh
-
-
MMBtu
$8,554
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,810
Cost:
-
- - $2,610 900 $(-800) - -
-
kWh
$2,610
900
MMBtu
$(-800)
-
$
04: 2.1222 INSTALL TURBULATORS Savings:
$1,981
Cost:
$1,000
- - $1,981 683 - - -
-
kWh
$1,981
683
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$601
Cost:
$2,322
$601 12,896 - - - - $601
12,896
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$123
Cost:
$127
$123 2,638 - - - - $123
2,638
kWh
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,575
Cost:
$200
$1,575 - - - - - $1,575
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,489
Cost:
$23,649
$2,299 15,534 $22,436 1,583 $7,754 - $2,299
15,534
kWh
$22,436
1,583
MMBtu
$7,754
-
$
TOTAL IMPLEMENTED Savings:
$30,313
Cost:
$21,127
$123 2,638 $22,436 1,583 $7,754 - $123
2,638
kWh
$22,436
1,583
MMBtu
$7,754
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes