IAC Assessment: KU0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1990
Principal Product GRAY IRON CASTINGS
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 105
Plant Area (Sq.Ft.) 0
Annual Production 2,900 Tons
Production Hrs. Annual 4,700
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,784 1,527,843 kWh $0.08
Natural Gas $64,982 41,468 MMBtu $1.57
Other Energy $146,635 22,594 MMBtu $6.49
TOTAL ENERGY COSTS $337,401
RECOMMENDED SAVINGS* $83,212 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,296
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,128
Cost:
$20,800
- - - - $16,128 2,485 - - -
-
kWh
-
-
MMBtu
$16,128
2,485
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,200
Cost:
$3,078
$4,438 53,927 - - - - $762 - $4,438
53,927
kWh
-
-
MMBtu
-
-
MMBtu
$762
-
$
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$391
Cost:
$466
- - $391 249 - - - - -
-
kWh
$391
249
MMBtu
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,788
Cost:
$2,802
- - $1,788 1,139 - - - - -
-
kWh
$1,788
1,139
MMBtu
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$675
Cost:
$1,416
$675 8,206 - - - - - - $675
8,206
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$8,297
Cost:
$11,700
$4,607 55,979 $3,690 2,350 - - - - $4,607
55,979
kWh
$3,690
2,350
MMBtu
-
-
MMBtu
-
-
$
07: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$50,733
Cost:
-
- - $15,072 4,108 $26,661 9,600 $9,000 - -
-
kWh
$15,072
4,108
MMBtu
$26,661
9,600
MMBtu
$9,000
-
$
TOTAL RECOMMENDED Savings:
$83,212
Cost:
$40,262
$9,720 118,112 $20,941 7,846 $42,789 12,085 $9,762 - $9,720
118,112
kWh
$20,941
7,846
MMBtu
$42,789
12,085
MMBtu
$9,762
-
$
TOTAL IMPLEMENTED Savings:
$65,296
Cost:
$16,660
$9,720 118,112 $19,153 6,707 $26,661 9,600 $9,762 - $9,720
118,112
kWh
$19,153
6,707
MMBtu
$26,661
9,600
MMBtu
$9,762
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes