IAC logo
IAC Assessment: KU0333
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1991
Principal Product METALS
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 64
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,804 1,838,511 kWh $0.07
Natural Gas $39,181 9,551 MMBtu $4.10
TOTAL ENERGY COSTS $175,985
RECOMMENDED SAVINGS* $18,799 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,799
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.5194 REDESIGN PROCESS Savings:
$1,119
Cost:
-
- - $1,119 273 -
-
kWh
$1,119
273
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,551
Cost:
$3,600
- - $3,551 866 -
-
kWh
$3,551
866
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,970
Cost:
$20,000
- - $6,970 1,700 -
-
kWh
$6,970
1,700
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,825
Cost:
$4,000
- - $3,825 933 -
-
kWh
$3,825
933
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$153
Cost:
-
$153 2,052 - - $153
2,052
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,398
Cost:
$200
$2,398 32,239 - - $2,398
32,239
kWh
-
-
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$698
Cost:
$1,000
$698 9,379 - - $698
9,379
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$85
Cost:
$84
$85 1,172 - - $85
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,799
Cost:
$28,884
$3,334 44,842 $15,465 3,772 $3,334
44,842
kWh
$15,465
3,772
MMBtu
TOTAL IMPLEMENTED Savings:
$18,799
Cost:
$28,884
$3,334 44,842 $15,465 3,772 $3,334
44,842
kWh
$15,465
3,772
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas