IAC Assessment: KU0386
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0386
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1992
Principal Product HYDRAULIC HOSE
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 50,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $687,976 16,185,815 kWh $0.04
Natural Gas $163,837 64,562 MMBtu $2.54
TOTAL ENERGY COSTS $851,813
RECOMMENDED SAVINGS* $44,798 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,288
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,084
Cost:
-
$2,320 54,513 - - $1,764 - $2,320
54,513
kWh
-
-
MMBtu
$1,764
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$15,585
Cost:
$25,288
$15,585 366,354 - - - - $15,585
366,354
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,093
Cost:
$6,720
$6,093 143,025 - - - - $6,093
143,025
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,155
Cost:
-
$9,181 216,002 - - $(-2,026) - $9,181
216,002
kWh
-
-
MMBtu
$(-2,026)
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,455
Cost:
$1,200
$2,455 57,737 - - - - $2,455
57,737
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$594
Cost:
$2,083
$594 14,068 - - - - $594
14,068
kWh
-
-
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,617
Cost:
$10,950
- - $3,617 1,424 - - -
-
kWh
$3,617
1,424
MMBtu
-
-
$
08: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,205
Cost:
$7,500
$2,205 51,876 - - - - $2,205
51,876
kWh
-
-
MMBtu
-
-
$
09: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$3,010
Cost:
$13,866
- - $3,010 1,185 - - -
-
kWh
$3,010
1,185
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$44,798
Cost:
$67,607
$38,433 903,575 $6,627 2,609 $(-262) - $38,433
903,575
kWh
$6,627
2,609
MMBtu
$(-262)
-
$
TOTAL IMPLEMENTED Savings:
$31,288
Cost:
$33,208
$33,314 783,118 - - $(-2,026) - $33,314
783,118
kWh
-
-
MMBtu
$(-2,026)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes