IAC Assessment: KU0408
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1993
Principal Product PHARMACEUTICALS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 420
Plant Area (Sq.Ft.) 0
Annual Production 56,000,000 Pieces
Production Hrs. Annual 2,298
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $437,829 11,788,980 kWh $0.04
Natural Gas $103,845 37,214 MMBtu $2.79
TOTAL ENERGY COSTS $541,674
RECOMMENDED SAVINGS* $10,283 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,303
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,776
Cost:
$5,655
$3,645 98,183 - - $131 - $3,645
98,183
kWh
-
-
MMBtu
$131
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$547
Cost:
$1,440
$283 7,620 - - $264 - $283
7,620
kWh
-
-
MMBtu
$264
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$176
Cost:
-
$176 4,689 - - - - $176
4,689
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,399
Cost:
$300
- - $2,399 860 - - -
-
kWh
$2,399
860
MMBtu
-
-
$
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$497
Cost:
$580
- - $497 178 - - -
-
kWh
$497
178
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,936
Cost:
$3,455
$1,936 52,169 - - - - $1,936
52,169
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$176
Cost:
$392
$176 4,689 - - - - $176
4,689
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$776
Cost:
-
$776 20,809 - - - - $776
20,809
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,283
Cost:
$11,822
$6,992 188,159 $2,896 1,038 $395 - $6,992
188,159
kWh
$2,896
1,038
MMBtu
$395
-
$
TOTAL IMPLEMENTED Savings:
$7,303
Cost:
$6,347
$4,773 128,370 $2,399 860 $131 - $4,773
128,370
kWh
$2,399
860
MMBtu
$131
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes