IAC logo
IAC Assessment: KU0453
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0453
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1995
Principal Product solid wood cabinet doors
NAICS n/a
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 42,582
Annual Production 325,090 Pieces
Production Hrs. Annual 2,080
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,871 809,496 kWh $0.05
Natural Gas $11,719 2,207 MMBtu $5.31
TOTAL ENERGY COSTS $55,590
RECOMMENDED SAVINGS* $7,843 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,320
Cost:
$17,800
- - $2,320 437 - - -
-
kWh
$2,320
437
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,625
Cost:
$4,257
$1,143 21,102 - - $482 - $1,143
21,102
kWh
-
-
MMBtu
$482
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$559
Cost:
$1,920
$413 7,620 - - $146 - $413
7,620
kWh
-
-
MMBtu
$146
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$270
Cost:
$350
$270 4,982 - - - - $270
4,982
kWh
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$939
Cost:
$1,922
$939 17,292 - - - - $939
17,292
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$350
Cost:
$79
$350 6,448 - - - - $350
6,448
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$652
Cost:
$600
$79 1,465 $573 108 - - $79
1,465
kWh
$573
108
MMBtu
-
-
$
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$349
Cost:
$95
$349 6,448 - - - - $349
6,448
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$365
Cost:
$340
$365 6,741 - - - - $365
6,741
kWh
-
-
MMBtu
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$414
Cost:
$138
- - $414 78 - - -
-
kWh
$414
78
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$7,843
Cost:
$27,501
$3,908 72,098 $3,307 623 $628 - $3,908
72,098
kWh
$3,307
623
MMBtu
$628
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes