IAC Assessment: KU0456
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1995
Principal Product mayonnaise
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 20,800
Annual Production 12,000,000 Pounds
Production Hrs. Annual 2,625
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,604 418,230 kWh $0.04
Natural Gas $1,182 246 MMBtu $4.80
TOTAL ENERGY COSTS $19,786
RECOMMENDED SAVINGS* $5,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,367
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption
$ kWh $ MMBtu $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,121
Cost:
$6,407
$1,851 29,308 - - $270 - - - $1,851
29,308
kWh
-
-
MMBtu
$270
-
$
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$926
Cost:
$900
$926 14,654 - - - - - - $926
14,654
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$292
Cost:
$408
$407 6,448 $(-115) (-25) - - - - $407
6,448
kWh
$(-115)
(-25)
MMBtu
-
-
$
-
-
Tgal
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$138
Cost:
$217
- - $138 30 - - - - -
-
kWh
$138
30
MMBtu
-
-
$
-
-
Tgal
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$150
Cost:
$450
- - $101 22 - - $49 - -
-
kWh
$101
22
MMBtu
-
-
$
$49
-
Tgal
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,740
Cost:
$3,500
$1,740 27,550 - - - - - - $1,740
27,550
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$5,367
Cost:
$11,882
$4,924 77,960 $124 27 $270 - $49 - $4,924
77,960
kWh
$124
27
MMBtu
$270
-
$
$49
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,367
Cost:
$11,882
$4,924 77,960 $124 27 $270 - $49 - $4,924
77,960
kWh
$124
27
MMBtu
$270
-
$
$49
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption