IAC Assessment: KU0459
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0459
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1996
Principal Product Plastic Containers
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 165,400
Annual Production 73,779,000 Pieces
Production Hrs. Annual 8,472
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $737,870 15,104,631 kWh $0.05
Electricity Demand $76,677 25,179 kW-months/year $3.05
Natural Gas $50,016 11,105 MMBtu $4.50
TOTAL ENERGY COSTS $864,751
RECOMMENDED SAVINGS* $60,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,341
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$20,000
Cost:
$1,833
$18,376 375,733 $1,624 532 - - - - - - - - - - $18,376
375,733
kWh
$1,624
532
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,330
Cost:
$15,534
$15,838 323,857 $1,492 489 - - - - - - - - - - $15,838
323,857
kWh
$1,492
489
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,967
Cost:
$4,716
$8,238 168,523 $729 239 - - - - - - - - - - $8,238
168,523
kWh
$729
239
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,896
Cost:
$1,208
- - - - $4,896 1,088 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,896
1,088
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,991
Cost:
$4,551
$2,748 56,272 $243 80 - - - - - - - - - - $2,748
56,272
kWh
$243
80
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,927
Cost:
$920
$2,689 55,100 $238 78 - - - - - - - - - - $2,689
55,100
kWh
$238
78
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,489
Cost:
$4,140
$2,287 46,893 $202 66 - - - - - - - - - - $2,287
46,893
kWh
$202
66
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$688
Cost:
-
- - - - - - $188 50,000 - - - - $500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$188
50,000
lb
-
-
$
-
-
$
$500
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$323
Cost:
$480
$130 2,638 $11 4 - - - - $140 - $42 - - - $130
2,638
kWh
$11
4
kW-months/year
-
-
MMBtu
-
-
lb
$140
-
$
$42
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,611
Cost:
$33,382
$50,306 1,029,016 $4,539 1,488 $4,896 1,088 $188 50,000 $140 - $42 - $500 - $50,306
1,029,016
kWh
$4,539
1,488
kW-months/year
$4,896
1,088
MMBtu
$188
50,000
lb
$140
-
$
$42
-
$
$500
-
$
TOTAL IMPLEMENTED Savings:
$38,341
Cost:
$17,847
$34,344 702,228 $3,127 1,025 - - $188 50,000 $140 - $42 - $500 - $34,344
702,228
kWh
$3,127
1,025
kW-months/year
-
-
MMBtu
$188
50,000
lb
$140
-
$
$42
-
$
$500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production