IAC logo
IAC Assessment: KU0470
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0470
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1996
Principal Product Fiberglass Power Boats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 197,900
Annual Production 1,600 Pieces
Production Hrs. Annual 2,500
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,261 3,569,168 kWh $0.07
Natural Gas $136,293 27,218 MMBtu $5.01
TOTAL ENERGY COSTS $392,097
RECOMMENDED SAVINGS* $220,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $219,805
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ gal $ lb $ $ $ $
01: 3.2124 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS Savings:
$181,872
Cost:
$5,120
- - - - $2,043 220,096 - - $179,829 - -
-
kWh
-
-
gal
$2,043
220,096
lb
-
-
$
$179,829
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$32,289
Cost:
$17,350
$(-1,007) (-15,826) $2,550 9,625 - - $(-6,004) - $36,750 - $(-1,007)
(-15,826)
kWh
$2,550
9,625
gal
-
-
lb
$(-6,004)
-
$
$36,750
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,532
Cost:
$252
$2,532 39,859 - - - - - - - - $2,532
39,859
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,397
Cost:
$2,450
$2,397 37,515 - - - - - - - - $2,397
37,515
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$715
Cost:
$1,958
$715 11,137 - - - - - - - - $715
11,137
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$352
Cost:
$352
$170 3,517 - - - - $182 - - - $170
3,517
kWh
-
-
gal
-
-
lb
$182
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$220,157
Cost:
$27,482
$4,807 76,202 $2,550 9,625 $2,043 220,096 $(-5,822) - $216,579 - $4,807
76,202
kWh
$2,550
9,625
gal
$2,043
220,096
lb
$(-5,822)
-
$
$216,579
-
$
TOTAL IMPLEMENTED Savings:
$219,805
Cost:
$27,130
$4,637 72,685 $2,550 9,625 $2,043 220,096 $(-6,004) - $216,579 - $4,637
72,685
kWh
$2,550
9,625
gal
$2,043
220,096
lb
$(-6,004)
-
$
$216,579
-
$
Savings
Cost
$ kWh $ gal $ lb $ $ $ $
Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material