IAC logo
IAC Assessment: KU0477
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0477
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product yearbooks
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 140,000
Annual Production 475,000 Pieces
Production Hrs. Annual 3,500
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,740 1,780,481 kWh $0.06
Electricity Demand $25,784 4,548 kW-months/year $5.67
Natural Gas $16,173 3,025 MMBtu $5.35
TOTAL ENERGY COSTS $378,289
RECOMMENDED SAVINGS* $11,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,820
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,340
Cost:
$18,090
$3,240 56,858 $1,100 195 - - - - - - $3,240
56,858
kWh
$1,100
195
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,980
Cost:
$1,600
$2,980 52,169 - - - - - - - - $2,980
52,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$640
Cost:
$1,000
- - - - $640 120 - - - - -
-
kWh
-
-
kW-months/year
$640
120
MMBtu
-
-
gal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$590
Cost:
$1,450
$450 7,913 $140 26 - - - - - - $450
7,913
kWh
$140
26
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$580
Cost:
$140
- - - - $580 110 - - - - -
-
kWh
-
-
kW-months/year
$580
110
MMBtu
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$350
Cost:
$130
$260 4,396 $90 15 - - - - - - $260
4,396
kWh
$90
15
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$340
Cost:
$1,100
$200 3,517 $70 12 - - - - $70 - $200
3,517
kWh
$70
12
kW-months/year
-
-
MMBtu
-
-
gal
$70
-
$
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,330
Cost:
$1,050
- - - - - - $1,500 40 $(-170) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,500
40
gal
$(-170)
-
$
TOTAL RECOMMENDED Savings:
$11,150
Cost:
$24,560
$7,130 124,853 $1,400 248 $1,220 230 $1,500 40 $(-100) - $7,130
124,853
kWh
$1,400
248
kW-months/year
$1,220
230
MMBtu
$1,500
40
gal
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$9,820
Cost:
$23,510
$7,130 124,853 $1,400 248 $1,220 230 - - $70 - $7,130
124,853
kWh
$1,400
248
kW-months/year
$1,220
230
MMBtu
-
-
gal
$70
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Primary Raw Material