IAC logo
IAC Assessment: KU0478
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0478
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1997
Principal Product printed products/catalogs
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 65,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,376 1,133,939 kWh $0.02
Electricity Demand $48,924 5,472 kW-months/year $8.94
Natural Gas $64,827 14,958 MMBtu $4.33
TOTAL ENERGY COSTS $595,525
RECOMMENDED SAVINGS* $22,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,350
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,110
Cost:
$58,000
- - - - $15,110 3,489 - - - - - - -
-
kWh
-
-
kW-months/year
$15,110
3,489
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,330
Cost:
$330
$570 27,843 $760 86 - - - - - - - - $570
27,843
kWh
$760
86
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,130
Cost:
-
$1,130 56,272 - - - - - - - - - - $1,130
56,272
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$730
Cost:
$170
$320 15,826 $410 46 - - - - - - - - $320
15,826
kWh
$410
46
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$500
Cost:
$780
$90 4,396 $50 6 - - - - $360 - - - $90
4,396
kWh
$50
6
kW-months/year
-
-
MMBtu
-
-
lb
$360
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$290
Cost:
$1,050
$120 6,155 $170 19 - - - - - - - - $120
6,155
kWh
$170
19
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$190
Cost:
$400
$190 9,672 - - - - - - - - - - $190
9,672
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$3,000
Cost:
-
- - - - - - $1,920 2,400 - - $1,080 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,920
2,400
lb
-
-
$
$1,080
-
$
TOTAL RECOMMENDED Savings:
$22,280
Cost:
$60,730
$2,420 120,164 $1,390 157 $15,110 3,489 $1,920 2,400 $360 - $1,080 - $2,420
120,164
kWh
$1,390
157
kW-months/year
$15,110
3,489
MMBtu
$1,920
2,400
lb
$360
-
$
$1,080
-
$
TOTAL IMPLEMENTED Savings:
$5,350
Cost:
$1,550
$1,010 49,824 $1,340 151 - - $1,920 2,400 - - $1,080 - $1,010
49,824
kWh
$1,340
151
kW-months/year
-
-
MMBtu
$1,920
2,400
lb
-
-
$
$1,080
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material