Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Univ. of Kansas |
---|---|
Assessment Year | 1999 |
Principal Product | pressure vessels |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | KS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,016 | 2,193,435 | kWh | $0.06 |
Electricity Demand | $41,503 | 8,401 | kW-months/year | $4.94 |
Natural Gas | $166,548 | 49,285 | MMBtu | $3.38 |
TOTAL ENERGY COSTS | $414,229 | |||
RECOMMENDED SAVINGS* | $51,650 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,680 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $11,410 Cost: $17,000 |
- | - | - | - | $11,410 | 3,376 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,410 3,376 MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $8,040 Cost: $20,000 |
$2,390 | 54,220 | $5,650 | 720 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,390 54,220 kWh |
$5,650 720 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $7,060 Cost: $12,170 |
$7,170 | 162,075 | $2,120 | 270 | $(-2,230) | (-691) | - | - | - | - | - | - | - | - | - | - |
$7,170 162,075 kWh |
$2,120 270 kW-months/year |
$(-2,230) (-691) MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $700 Cost: $450 |
$460 | 10,258 | $240 | 31 | - | - | - | - | - | - | - | - | - | - | - | - |
$460 10,258 kWh |
$240 31 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $260 Cost: $360 |
$60 | 1,465 | $40 | 5 | - | - | - | - | - | - | - | - | $160 | - | - | - |
$60 1,465 kWh |
$40 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - lb |
$160 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $9,410 Cost: $14,000 |
$(-1,770) | (-39,859) | $(-1,510) | (-136) | - | - | $12,690 | 2,440,000 | - | - | - | - | - | - | - | - |
$(-1,770) (-39,859) kWh |
$(-1,510) (-136) kW-months/year |
- - MMBtu |
$12,690 2,440,000 Tgal |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $12,150 Cost: $11,640 |
- | - | - | - | - | - | - | - | - | - | $33,750 | 3,000,000 | - | - | $(-21,600) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$33,750 3,000,000 lb |
- - $ |
$(-21,600) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE |
Savings: $2,620 Cost: $800 |
- | - | - | - | - | - | - | - | $210 | 182 | - | - | - | - | $2,410 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$210 182 gal |
- - lb |
- - $ |
$2,410 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,650 Cost: $76,420 |
$8,310 | 188,159 | $6,540 | 890 | $9,180 | 2,685 | $12,690 | 2,440,000 | $210 | 182 | $33,750 | 3,000,000 | $160 | - | $(-19,190) | - | $8,310 188,159 kWh |
$6,540 890 kW-months/year |
$9,180 2,685 MMBtu |
$12,690 2,440,000 Tgal |
$210 182 gal |
$33,750 3,000,000 lb |
$160 - $ |
$(-19,190) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,680 Cost: $33,780 |
$10,080 | 228,018 | $8,050 | 1,026 | $(-2,230) | (-691) | - | - | $210 | 182 | - | - | $160 | - | $2,410 | - | $10,080 228,018 kWh |
$8,050 1,026 kW-months/year |
$(-2,230) (-691) MMBtu |
- - Tgal |
$210 182 gal |
- - lb |
$160 - $ |
$2,410 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |