IAC Assessment: LE0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2001
Principal Product Heat treated strip steel
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 132
Plant Area (Sq.Ft.) 25,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,135,001 28,008,000 kWh $0.08
Electricity Demand $483,781 4,067 kW-months/year $118.95
Natural Gas $359,614 70,178 MMBtu $5.12
TOTAL ENERGY COSTS $3,002,396
RECOMMENDED SAVINGS* $217,065 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $217,065
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$9,696
Cost:
$500
- - - - $9,696 1,899 - - -
-
kWh
-
-
kW-months/year
$9,696
1,899
MMBtu
-
-
$
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$26,225
Cost:
$30,000
$20,280 394,200 $5,945 50 - - - - $20,280
394,200
kWh
$5,945
50
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$78,362
Cost:
$2,500
- - $78,362 659 - - - - -
-
kWh
$78,362
659
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,752
Cost:
$800
$3,276 42,573 $476 4 - - - - $3,276
42,573
kWh
$476
4
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$89,879
Cost:
-
$79,535 908,772 $10,344 87 - - - - $79,535
908,772
kWh
$10,344
87
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$3,984
Cost:
$2,000
- - - - - - $3,984 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,984
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$5,167
Cost:
$2,000
$5,167 67,802 - - - - - - $5,167
67,802
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$217,065
Cost:
$37,800
$108,258 1,413,347 $95,127 800 $9,696 1,899 $3,984 - $108,258
1,413,347
kWh
$95,127
800
kW-months/year
$9,696
1,899
MMBtu
$3,984
-
$
TOTAL IMPLEMENTED Savings:
$217,065
Cost:
$37,800
$108,258 1,413,347 $95,127 800 $9,696 1,899 $3,984 - $108,258
1,413,347
kWh
$95,127
800
kW-months/year
$9,696
1,899
MMBtu
$3,984
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost