Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2001 |
Principal Product | Television Phosphor |
NAICS | n/a |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 107 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 1,262,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $822,977 | 9,510,222 | kWh | $0.09 |
Electricity Demand | $156,499 | 17,307 | kW-months/year | $9.04 |
Natural Gas | $102,616 | 15,146 | MMBtu | $6.78 |
TOTAL ENERGY COSTS | $1,082,092 | |||
RECOMMENDED SAVINGS* | $115,772 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $94,614 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $23,468 Cost: $2,500 |
- | - | $23,468 | 2,596 | - | - | - | - |
- - kWh |
$23,468 2,596 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2123 INSULATE FEEDWATER TANK |
Savings: $14,924 Cost: $380 |
- | - | - | - | $14,924 | 1,960 | - | - |
- - kWh |
- - kW-months/year |
$14,924 1,960 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $57,598 Cost: $6,000 |
$57,598 | 821,660 | - | - | - | - | - | - |
$57,598 821,660 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $13,548 Cost: - |
- | - | - | - | - | - | $13,548 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,548 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,354 Cost: $1,280 |
$1,632 | 23,275 | $722 | 80 | - | - | - | - |
$1,632 23,275 kWh |
$722 80 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,880 Cost: - |
$3,109 | 44,366 | $771 | 85 | - | - | - | - |
$3,109 44,366 kWh |
$771 85 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $115,772 Cost: $10,160 |
$62,339 | 889,301 | $24,961 | 2,761 | $14,924 | 1,960 | $13,548 | - | $62,339 889,301 kWh |
$24,961 2,761 kW-months/year |
$14,924 1,960 MMBtu |
$13,548 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $94,614 Cost: $8,500 |
$57,598 | 821,660 | $23,468 | 2,596 | - | - | $13,548 | - | $57,598 821,660 kWh |
$23,468 2,596 kW-months/year |
- - MMBtu |
$13,548 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |