IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2002
Principal Product Automotive/Truck Leaf Springs
NAICS n/a
SIC 3493 - Steel Springs, Except Wire
Sales $50,000,000-$100,000,000
# of Employees 244
Plant Area (Sq.Ft.) 97,000
Annual Production 9,000 Pieces
Production Hrs. Annual 6,120
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,672 2,118,600 kWh $0.07
Electricity Demand $57,439 5,606 kW-months/year $10.25
Natural Gas $396,900 71,076 MMBtu $5.58
TOTAL ENERGY COSTS $601,011
RECOMMENDED SAVINGS* $61,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,396
Cost:
$1,000
$872 20,714 $524 51 - - $872
20,714
kWh
$524
51
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,018
Cost:
-
$2,018 47,938 - - - - $2,018
47,938
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,005
Cost:
$100
$4,005 95,131 - - - - $4,005
95,131
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,139
Cost:
$882
$3,478 82,620 $1,661 162 - - $3,478
82,620
kWh
$1,661
162
kW-months/year
-
-
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,495
Cost:
$7,000
- - - - $2,495 358 -
-
kWh
-
-
kW-months/year
$2,495
358
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,311
Cost:
$2,000
- - $9,311 908 - - -
-
kWh
$9,311
908
kW-months/year
-
-
MMBtu
07: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$36,900
Cost:
$30,000
- - - - $36,900 7,738 -
-
kWh
-
-
kW-months/year
$36,900
7,738
MMBtu
TOTAL RECOMMENDED Savings:
$61,264
Cost:
$40,982
$10,373 246,403 $11,496 1,121 $39,395 8,096 $10,373
246,403
kWh
$11,496
1,121
kW-months/year
$39,395
8,096
MMBtu
TOTAL IMPLEMENTED Savings:
$11,162
Cost:
$982
$9,501 225,689 $1,661 162 - - $9,501
225,689
kWh
$1,661
162
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas