IAC Assessment: LE0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2004
Principal Product Machined Metal Axles and Shafts
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 53,000
Annual Production 0 Units
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,632 1,861,900 kWh $0.07
Electricity Demand $85,990 7,148 kW-months/year $12.03
Natural Gas $12,828 1,364 MMBtu $9.40
TOTAL ENERGY COSTS $236,450
RECOMMENDED SAVINGS* $65,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,970
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$46,917
Cost:
-
- - $46,917 3,900 - - -
-
kWh
$46,917
3,900
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,802
Cost:
$17,364
$5,792 78,273 $3,010 250 - - $5,792
78,273
kWh
$3,010
250
kW-months/year
-
-
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,024
Cost:
$2,200
$4,179 56,481 $1,845 153 - - $4,179
56,481
kWh
$1,845
153
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,020
Cost:
$300
$708 9,566 $312 26 - - $708
9,566
kWh
$312
26
kW-months/year
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,067
Cost:
$1,200
$727 9,819 $340 28 - - $727
9,819
kWh
$340
28
kW-months/year
-
-
MMBtu
06: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED Savings:
$942
Cost:
$550
- - - - $942 100 -
-
kWh
-
-
kW-months/year
$942
100
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$903
Cost:
$1,350
$903 12,214 - - - - $903
12,214
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$65,675
Cost:
$22,964
$12,309 166,353 $52,424 4,357 $942 100 $12,309
166,353
kWh
$52,424
4,357
kW-months/year
$942
100
MMBtu
TOTAL IMPLEMENTED Savings:
$55,970
Cost:
$4,250
$5,614 75,866 $49,414 4,107 $942 100 $5,614
75,866
kWh
$49,414
4,107
kW-months/year
$942
100
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas