IAC logo
IAC Assessment: LE0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2004
Principal Product Custom Bags
NAICS 314910 - Textile Bag and Canvas Mills
SIC 2393 - Textile Bags
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 49,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,614 1,582,272 kWh $0.05
Electricity Demand $38,139 5,443 kW-months/year $7.01
TOTAL ENERGY COSTS $117,753
RECOMMENDED SAVINGS* $34,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,546
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,836
Cost:
$43,080
$4,931 98,032 $3,905 557 $4,931
98,032
kWh
$3,905
557
kW-months/year
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,144
Cost:
$35,305
$5,494 109,225 $2,650 378 $5,494
109,225
kWh
$2,650
378
kW-months/year
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,386
Cost:
$6,346
$2,159 42,923 $1,227 175 $2,159
42,923
kWh
$1,227
175
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,153
Cost:
$9,850
$2,153 42,805 - - $2,153
42,805
kWh
-
-
kW-months/year
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,720
Cost:
$6,500
$1,720 34,207 - - $1,720
34,207
kWh
-
-
kW-months/year
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,297
Cost:
$4,020
$659 13,104 $638 91 $659
13,104
kWh
$638
91
kW-months/year
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$915
Cost:
$100
$508 10,098 $407 58 $508
10,098
kWh
$407
58
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$411
Cost:
$1,125
$411 8,163 - - $411
8,163
kWh
-
-
kW-months/year
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$132
Cost:
$300
$80 1,594 $52 7 $80
1,594
kWh
$52
7
kW-months/year
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,631
Cost:
$76,467
$4,224 83,971 $3,407 486 $4,224
83,971
kWh
$3,407
486
kW-months/year
TOTAL RECOMMENDED Savings:
$34,625
Cost:
$183,093
$22,339 444,122 $12,286 1,752 $22,339
444,122
kWh
$12,286
1,752
kW-months/year
TOTAL IMPLEMENTED Savings:
$8,546
Cost:
$76,567
$4,732 94,069 $3,814 544 $4,732
94,069
kWh
$3,814
544
kW-months/year
Savings
Cost
$ kWh $ kW-months/year