IAC Assessment: LE0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2004
Principal Product Remanufactured Engines,Transmissions, and Carriers
NAICS 333618 - Other Engine Equipment Manufacturing
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 152
Plant Area (Sq.Ft.) 120,000
Annual Production 172,450 Pieces
Production Hrs. Annual 5,880
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,080 2,676,000 kWh $0.06
Electricity Demand $58,928 8,491 kW-months/year $6.94
Natural Gas $29,471 2,549 MMBtu $11.56
Fuel Oil #1 $41,891 5,603 MMBtu $7.48
Fuel Oil #2 $41,891 5,603 MMBtu $7.48
TOTAL ENERGY COSTS $321,261
RECOMMENDED SAVINGS* $100,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,664
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$65,403
Cost:
$20,000
- - - - - - - - $41,891 5,603 $23,512 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$41,891
5,603
MMBtu
$23,512
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$17,844
Cost:
$50,000
- - - - $17,844 - - - - - - - -
-
kWh
-
-
kW-months/year
$17,844
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,450
Cost:
$2,500
- - $2,450 425 - - - - - - - - -
-
kWh
$2,450
425
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,412
Cost:
$750
- - - - - - $1,412 122 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,412
122
MMBtu
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,074
Cost:
$218
$857 15,303 $217 32 - - - - - - - - $857
15,303
kWh
$217
32
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,187
Cost:
$33,512
$9,541 170,368 $2,646 381 - - - - - - - - $9,541
170,368
kWh
$2,646
381
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$100,370
Cost:
$106,980
$10,398 185,671 $5,313 838 $17,844 - $1,412 122 $41,891 5,603 $23,512 - $10,398
185,671
kWh
$5,313
838
kW-months/year
$17,844
-
$
$1,412
122
MMBtu
$41,891
5,603
MMBtu
$23,512
-
$
TOTAL IMPLEMENTED Savings:
$78,664
Cost:
$53,730
$10,398 185,671 $2,863 413 - - - - $41,891 5,603 $23,512 - $10,398
185,671
kWh
$2,863
413
kW-months/year
-
-
$
-
-
MMBtu
$41,891
5,603
MMBtu
$23,512
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #2 Administrative Changes