IAC Assessment: LE0198
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0198
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2004
Principal Product Disposable Anesthesia Supplies
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 150,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,261 2,893,300 kWh $0.07
Electricity Demand $49,992 6,888 kW-months/year $7.26
Natural Gas $46,984 7,654 MMBtu $6.14
TOTAL ENERGY COSTS $299,237
RECOMMENDED SAVINGS* $26,429 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,483
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$20,168
Cost:
$76,950
$12,690 181,285 $7,478 1,030 $12,690
181,285
kWh
$7,478
1,030
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,500
Cost:
$2,500
- - $2,500 344 -
-
kWh
$2,500
344
kW-months/year
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,443
Cost:
$24,000
$2,443 34,912 - - $2,443
34,912
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$778
Cost:
$200
$654 9,345 $124 17 $654
9,345
kWh
$124
17
kW-months/year
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$540
Cost:
$566
$217 3,094 $323 45 $217
3,094
kWh
$323
45
kW-months/year
TOTAL RECOMMENDED Savings:
$26,429
Cost:
$104,216
$16,004 228,636 $10,425 1,436 $16,004
228,636
kWh
$10,425
1,436
kW-months/year
TOTAL IMPLEMENTED Savings:
$5,483
Cost:
$27,066
$2,660 38,006 $2,823 389 $2,660
38,006
kWh
$2,823
389
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand