IAC logo
IAC Assessment: LE0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Injection Molded Medical Components
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 60,000
Annual Production 90,000,000 Pieces
Production Hrs. Annual 5,616
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $408,259 6,081,000 kWh $0.07
Electricity Demand $85,116 14,819 kW-months/year $5.74
Natural Gas $16,928 2,134 MMBtu $7.93
TOTAL ENERGY COSTS $510,303
RECOMMENDED SAVINGS* $58,938 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,536
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$34,823
Cost:
$36,750
$34,823 429,387 - - - - $34,823
429,387
kWh
-
-
kW-months/year
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,610
Cost:
$3,000
- - $8,610 1,500 - - -
-
kWh
$8,610
1,500
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,713
Cost:
$3,840
$4,963 61,198 $750 131 - - $4,963
61,198
kWh
$750
131
kW-months/year
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,600
Cost:
$5,000
- - - - $3,600 - -
-
kWh
-
-
kW-months/year
$3,600
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,466
Cost:
$3,000
$2,142 26,414 $324 56 - - $2,142
26,414
kWh
$324
56
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,461
Cost:
-
$1,461 18,040 - - - - $1,461
18,040
kWh
-
-
kW-months/year
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,401
Cost:
$500
$1,251 15,448 $150 26 - - $1,251
15,448
kWh
$150
26
kW-months/year
-
-
$
08: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$864
Cost:
-
$864 10,670 - - - - $864
10,670
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$58,938
Cost:
$52,090
$45,504 561,157 $9,834 1,713 $3,600 - $45,504
561,157
kWh
$9,834
1,713
kW-months/year
$3,600
-
$
TOTAL IMPLEMENTED Savings:
$40,536
Cost:
$40,590
$39,786 490,585 $750 131 - - $39,786
490,585
kWh
$750
131
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $