Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2005
Principal Product Aluminium Pigment
NAICS 325130 - Synthetic Dye and Pigment Manufacturing
SIC 2816 - Inorganic Pigments
Sales $50,000,000-$100,000,000
# of Employees 84
Plant Area (Sq.Ft.) 110,000
Annual Production 4,300,000 Pounds
Production Hrs. Annual 8,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $371,898 8,578,800 kWh $0.04
Electricity Demand $79,064 15,331 kW-months/year $5.16
Fuel Oil #2 $246,604 30,246 MMBtu $8.15
TOTAL ENERGY COSTS $697,566
RECOMMENDED SAVINGS* $165,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $107,347
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$99,127
Cost:
$115,500
$83,064 1,931,741 $16,063 3,113 - - - - $83,064
1,931,741
kWh
$16,063
3,113
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$30,899
Cost:
$320
$22,169 515,559 $8,730 1,692 - - - - $22,169
515,559
kWh
$8,730
1,692
kW-months/year
-
-
MMBtu
-
-
gal
03: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$11,172
Cost:
$3,000
- - - - $9,770 1,104 $1,402 8,760 -
-
kWh
-
-
kW-months/year
$9,770
1,104
MMBtu
$1,402
8,760
gal
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,220
Cost:
$1,588
$6,530 151,853 $1,690 328 - - - - $6,530
151,853
kWh
$1,690
328
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,903
Cost:
$5,000
- - - - $4,903 554 - - -
-
kWh
-
-
kW-months/year
$4,903
554
MMBtu
-
-
gal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,894
Cost:
$480
$4,894 113,804 - - - - - - $4,894
113,804
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,801
Cost:
$2,000
- - $3,801 737 - - - - -
-
kWh
$3,801
737
kW-months/year
-
-
MMBtu
-
-
gal
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,755
Cost:
$600
$2,308 53,681 $447 87 - - - - $2,308
53,681
kWh
$447
87
kW-months/year
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$165,771
Cost:
$128,488
$118,965 2,766,638 $30,731 5,957 $14,673 1,658 $1,402 8,760 $118,965
2,766,638
kWh
$30,731
5,957
kW-months/year
$14,673
1,658
MMBtu
$1,402
8,760
gal
TOTAL IMPLEMENTED Savings:
$107,347
Cost:
$117,088
$89,594 2,083,594 $17,753 3,441 - - - - $89,594
2,083,594
kWh
$17,753
3,441
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz)