Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2005 |
Principal Product | Aluminium Pigment |
NAICS | 325130 - Synthetic Dye and Pigment Manufacturing |
SIC | 2816 - Inorganic Pigments |
Sales | $50,000,000-$100,000,000 |
# of Employees | 84 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 4,300,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $371,898 | 8,578,800 | kWh | $0.04 |
Electricity Demand | $79,064 | 15,331 | kW-months/year | $5.16 |
Fuel Oil #2 | $246,604 | 30,246 | MMBtu | $8.15 |
TOTAL ENERGY COSTS | $697,566 | |||
RECOMMENDED SAVINGS* | $165,771 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $107,347 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $99,127 Cost: $115,500 |
$83,064 | 1,931,741 | $16,063 | 3,113 | - | - | - | - |
$83,064 1,931,741 kWh |
$16,063 3,113 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $30,899 Cost: $320 |
$22,169 | 515,559 | $8,730 | 1,692 | - | - | - | - |
$22,169 515,559 kWh |
$8,730 1,692 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $11,172 Cost: $3,000 |
- | - | - | - | $9,770 | 1,104 | $1,402 | 8,760 |
- - kWh |
- - kW-months/year |
$9,770 1,104 MMBtu |
$1,402 8,760 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $8,220 Cost: $1,588 |
$6,530 | 151,853 | $1,690 | 328 | - | - | - | - |
$6,530 151,853 kWh |
$1,690 328 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,903 Cost: $5,000 |
- | - | - | - | $4,903 | 554 | - | - |
- - kWh |
- - kW-months/year |
$4,903 554 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,894 Cost: $480 |
$4,894 | 113,804 | - | - | - | - | - | - |
$4,894 113,804 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,801 Cost: $2,000 |
- | - | $3,801 | 737 | - | - | - | - |
- - kWh |
$3,801 737 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,755 Cost: $600 |
$2,308 | 53,681 | $447 | 87 | - | - | - | - |
$2,308 53,681 kWh |
$447 87 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $165,771 Cost: $128,488 |
$118,965 | 2,766,638 | $30,731 | 5,957 | $14,673 | 1,658 | $1,402 | 8,760 | $118,965 2,766,638 kWh |
$30,731 5,957 kW-months/year |
$14,673 1,658 MMBtu |
$1,402 8,760 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $107,347 Cost: $117,088 |
$89,594 | 2,083,594 | $17,753 | 3,441 | - | - | - | - | $89,594 2,083,594 kWh |
$17,753 3,441 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) |