IAC logo
IAC Assessment: LE0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product specialty gas mixtures
NAICS 325120 - Industrial Gas Manufacturing
SIC 2813 - Industrial Gases
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 50,000
Annual Production 60,000 Pieces
Production Hrs. Annual 4,992
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,593 1,877,600 kWh $0.09
Electricity Demand $25,294 4,173 kW-months/year $6.06
Natural Gas $22,475 1,879 MMBtu $11.96
TOTAL ENERGY COSTS $222,362
RECOMMENDED SAVINGS* $45,906 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,350
Cost:
$2,400
- - - - $10,350 865 -
-
kWh
-
-
kW-months/year
$10,350
865
MMBtu
02: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$9,950
Cost:
$2,250
$9,950 107,016 - - - - $9,950
107,016
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$9,817
Cost:
-
- - $9,817 1,620 - - -
-
kWh
$9,817
1,620
kW-months/year
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,528
Cost:
-
$6,528 70,200 - - - - $6,528
70,200
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,758
Cost:
$900
$1,758 18,900 - - - - $1,758
18,900
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$959
Cost:
$200
$959 10,361 - - - - $959
10,361
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,282
Cost:
$1,500
$2,282 24,534 - - - - $2,282
24,534
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,262
Cost:
$13,497
$3,257 35,027 $1,005 166 - - $3,257
35,027
kWh
$1,005
166
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,906
Cost:
$20,747
$24,734 266,038 $10,822 1,786 $10,350 865 $24,734
266,038
kWh
$10,822
1,786
kW-months/year
$10,350
865
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas