Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2006 |
Principal Product | low fractional hp motors |
NAICS | 335312 - Motor and Generator Manufacturing |
SIC | 3621 - Motors And Generators |
Sales | $10,000,000-$50,000,000 |
# of Employees | 219 |
Plant Area (Sq.Ft.) | 58,000 |
Annual Production | 850,000 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $144,260 | 1,564,500 | kWh | $0.09 |
Electricity Demand | $28,938 | 4,807 | kW-months/year | $6.02 |
Natural Gas | $16,157 | 1,376 | MMBtu | $11.74 |
TOTAL ENERGY COSTS | $189,355 | |||
RECOMMENDED SAVINGS* | $112,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.426 MODIFY WORKLOAD |
Savings: $35,100 Cost: $3,200 |
- | - | - | - | $35,100 | - |
- - kWh |
- - kW-months/year |
$35,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $33,102 Cost: $38,465 |
$26,102 | 283,712 | $7,000 | 1,163 | - | - |
$26,102 283,712 kWh |
$7,000 1,163 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $7,750 Cost: $3,510 |
$4,006 | 43,537 | $3,744 | 622 | - | - |
$4,006 43,537 kWh |
$3,744 622 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,787 Cost: $500 |
$2,909 | 31,616 | $878 | 146 | - | - |
$2,909 31,616 kWh |
$878 146 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $3,612 Cost: $620 |
- | - | $3,612 | 600 | - | - |
- - kWh |
$3,612 600 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $809 Cost: $60 |
$611 | 6,644 | $198 | 33 | - | - |
$611 6,644 kWh |
$198 33 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $363 Cost: $500 |
$232 | 2,518 | $131 | 22 | - | - |
$232 2,518 kWh |
$131 22 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $7,549 Cost: $2,440 |
$7,549 | 82,103 | - | - | - | - |
$7,549 82,103 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,445 Cost: $51,983 |
$15,703 | 170,680 | $4,742 | 788 | - | - |
$15,703 170,680 kWh |
$4,742 788 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,517 Cost: $101,278 |
$57,112 | 620,810 | $20,305 | 3,374 | $35,100 | - | $57,112 620,810 kWh |
$20,305 3,374 kW-months/year |
$35,100 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |