IAC Assessment: LE0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product low fractional hp motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 219
Plant Area (Sq.Ft.) 58,000
Annual Production 850,000 Pieces
Production Hrs. Annual 2,340
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,260 1,564,500 kWh $0.09
Electricity Demand $28,938 4,807 kW-months/year $6.02
Natural Gas $16,157 1,376 MMBtu $11.74
TOTAL ENERGY COSTS $189,355
RECOMMENDED SAVINGS* $112,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 4.4260 MODIFY WORKLOAD Savings:
$35,100
Cost:
$3,200
- - - - $35,100 - -
-
kWh
-
-
kW-months/year
$35,100
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$33,102
Cost:
$38,465
$26,102 283,712 $7,000 1,163 - - $26,102
283,712
kWh
$7,000
1,163
kW-months/year
-
-
$
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$7,750
Cost:
$3,510
$4,006 43,537 $3,744 622 - - $4,006
43,537
kWh
$3,744
622
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,787
Cost:
$500
$2,909 31,616 $878 146 - - $2,909
31,616
kWh
$878
146
kW-months/year
-
-
$
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$3,612
Cost:
$620
- - $3,612 600 - - -
-
kWh
$3,612
600
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$809
Cost:
$60
$611 6,644 $198 33 - - $611
6,644
kWh
$198
33
kW-months/year
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$363
Cost:
$500
$232 2,518 $131 22 - - $232
2,518
kWh
$131
22
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,549
Cost:
$2,440
$7,549 82,103 - - - - $7,549
82,103
kWh
-
-
kW-months/year
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,445
Cost:
$51,983
$15,703 170,680 $4,742 788 - - $15,703
170,680
kWh
$4,742
788
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$112,517
Cost:
$101,278
$57,112 620,810 $20,305 3,374 $35,100 - $57,112
620,810
kWh
$20,305
3,374
kW-months/year
$35,100
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes