IAC Assessment: LE0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product Boxed Chocolates
NAICS 311352 - Confectionery Manufacturing from Purchased Chocolate
SIC 2064 - Candy & Other Confectionery Products
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 108,000
Annual Production 5,014,500 Pounds
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,577 4,745,700 kWh $0.06
Electricity Demand $68,328 10,183 kW-months/year $6.71
Natural Gas $140,516 12,097 MMBtu $11.62
TOTAL ENERGY COSTS $470,421
RECOMMENDED SAVINGS* $94,004 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,846
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$44,800
Cost:
$14,036
- - - - - - $44,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$44,800
-
%
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,283
Cost:
$17,728
- - - - $19,283 1,659 - - -
-
kWh
-
-
kW-months/year
$19,283
1,659
MMBtu
-
-
%
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,534
Cost:
$2,100
- - - - $8,534 1,587 - - -
-
kWh
-
-
kW-months/year
$8,534
1,587
MMBtu
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,332
Cost:
$800
$4,683 85,153 $1,649 246 - - - - $4,683
85,153
kWh
$1,649
246
kW-months/year
-
-
MMBtu
-
-
%
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,990
Cost:
$3,000
$2,151 39,085 $839 125 - - - - $2,151
39,085
kWh
$839
125
kW-months/year
-
-
MMBtu
-
-
%
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,416
Cost:
$2,500
- - $3,416 509 - - - - -
-
kWh
$3,416
509
kW-months/year
-
-
MMBtu
-
-
%
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$881
Cost:
$197
- - - - $881 76 - - -
-
kWh
-
-
kW-months/year
$881
76
MMBtu
-
-
%
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$789
Cost:
$1,000
$536 9,736 $253 38 - - - - $536
9,736
kWh
$253
38
kW-months/year
-
-
MMBtu
-
-
%
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$465
Cost:
$375
$465 8,326 - - - - - - $465
8,326
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,514
Cost:
$12,000
$4,817 87,610 $1,697 253 - - - - $4,817
87,610
kWh
$1,697
253
kW-months/year
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$94,004
Cost:
$53,736
$12,652 229,910 $7,854 1,171 $28,698 3,322 $44,800 - $12,652
229,910
kWh
$7,854
1,171
kW-months/year
$28,698
3,322
MMBtu
$44,800
-
%
TOTAL IMPLEMENTED Savings:
$12,846
Cost:
$12,800
$9,500 172,763 $3,346 499 - - - - $9,500
172,763
kWh
$3,346
499
kW-months/year
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production