IAC Assessment: LE0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2006
Principal Product paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 180,000
Annual Production 20,000 Tons
Production Hrs. Annual 6,984
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $504,355 12,272,235 kWh $0.04
Electricity Demand $243,166 25,456 kW-months/year $9.55
Electricity Fees $22,758 - $ -
Natural Gas $87,249 7,121 MMBtu $12.25
Fuel Oil #6 $1,367,317 189,748 MMBtu $7.21
TOTAL ENERGY COSTS $2,224,845
RECOMMENDED SAVINGS* $531,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,083
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.5194 REDESIGN PROCESS Savings:
$328,340
Cost:
$1,000,000
- - - - - - $328,340 45,540 -
-
kWh
-
-
kW-months/year
-
-
$
$328,340
45,540
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$123,125
Cost:
$25,000
- - - - - - $123,125 17,077 -
-
kWh
-
-
kW-months/year
-
-
$
$123,125
17,077
MMBtu
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$23,441
Cost:
$17,600
- - $23,441 2,455 - - - - -
-
kWh
$23,441
2,455
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$22,758
Cost:
$42,650
- - - - $22,758 - - - -
-
kWh
-
-
kW-months/year
$22,758
-
$
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$15,083
Cost:
$2,500
$10,052 245,179 $5,031 527 - - - - $10,052
245,179
kWh
$5,031
527
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,063
Cost:
$2,750
$5,131 125,128 $2,932 307 - - - - $5,131
125,128
kWh
$2,932
307
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,742
Cost:
$300
$4,101 100,033 $1,641 172 - - - - $4,101
100,033
kWh
$1,641
172
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,686
Cost:
$300
$1,918 46,778 $768 80 - - - - $1,918
46,778
kWh
$768
80
kW-months/year
-
-
$
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,309
Cost:
$700
$1,860 45,380 $449 47 - - - - $1,860
45,380
kWh
$449
47
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$531,547
Cost:
$1,091,800
$23,062 562,498 $34,262 3,588 $22,758 - $451,465 62,617 $23,062
562,498
kWh
$34,262
3,588
kW-months/year
$22,758
-
$
$451,465
62,617
MMBtu
TOTAL IMPLEMENTED Savings:
$15,083
Cost:
$2,500
$10,052 245,179 $5,031 527 - - - - $10,052
245,179
kWh
$5,031
527
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6