Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2006 |
Principal Product | paper |
NAICS | 322121 - Paper (except Newsprint) Mills |
SIC | 2621 - Paper Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 20,000 Tons |
Production Hrs. Annual | 6,984 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $504,355 | 12,272,235 | kWh | $0.04 |
Electricity Demand | $243,166 | 25,456 | kW-months/year | $9.55 |
Electricity Fees | $22,758 | - | $ | - |
Natural Gas | $87,249 | 7,121 | MMBtu | $12.25 |
Fuel Oil #6 | $1,367,317 | 189,748 | MMBtu | $7.21 |
TOTAL ENERGY COSTS | $2,224,845 | |||
RECOMMENDED SAVINGS* | $531,547 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,083 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5194 REDESIGN PROCESS |
Savings: $328,340 Cost: $1,000,000 |
- | - | - | - | - | - | $328,340 | 45,540 |
- - kWh |
- - kW-months/year |
- - $ |
$328,340 45,540 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $123,125 Cost: $25,000 |
- | - | - | - | - | - | $123,125 | 17,077 |
- - kWh |
- - kW-months/year |
- - $ |
$123,125 17,077 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $23,441 Cost: $17,600 |
- | - | $23,441 | 2,455 | - | - | - | - |
- - kWh |
$23,441 2,455 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $22,758 Cost: $42,650 |
- | - | - | - | $22,758 | - | - | - |
- - kWh |
- - kW-months/year |
$22,758 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $15,083 Cost: $2,500 |
$10,052 | 245,179 | $5,031 | 527 | - | - | - | - |
$10,052 245,179 kWh |
$5,031 527 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,063 Cost: $2,750 |
$5,131 | 125,128 | $2,932 | 307 | - | - | - | - |
$5,131 125,128 kWh |
$2,932 307 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,742 Cost: $300 |
$4,101 | 100,033 | $1,641 | 172 | - | - | - | - |
$4,101 100,033 kWh |
$1,641 172 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,686 Cost: $300 |
$1,918 | 46,778 | $768 | 80 | - | - | - | - |
$1,918 46,778 kWh |
$768 80 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,309 Cost: $700 |
$1,860 | 45,380 | $449 | 47 | - | - | - | - |
$1,860 45,380 kWh |
$449 47 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $531,547 Cost: $1,091,800 |
$23,062 | 562,498 | $34,262 | 3,588 | $22,758 | - | $451,465 | 62,617 | $23,062 562,498 kWh |
$34,262 3,588 kW-months/year |
$22,758 - $ |
$451,465 62,617 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,083 Cost: $2,500 |
$10,052 | 245,179 | $5,031 | 527 | - | - | - | - | $10,052 245,179 kWh |
$5,031 527 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 |