IAC logo
IAC Assessment: LE0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2008
Principal Product Custom point of purchase displays, kiosks, and retail environments
NAICS 337212 - Custom Architectural Woodwork and Millwork Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 116,600
Annual Production 6,000 Pieces
Production Hrs. Annual 2,040
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,563 1,088,400 kWh $0.07
Electricity Demand $28,730 3,254 kW-months/year $8.83
Natural Gas $27,695 1,532 MMBtu $18.08
TOTAL ENERGY COSTS $129,988
RECOMMENDED SAVINGS* $81,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,137
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$42,137
Cost:
$2,614
$35,762 525,917 $6,375 722 $35,762
525,917
kWh
$6,375
722
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$28,436
Cost:
$1,860
$28,436 418,170 - - $28,436
418,170
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,346
Cost:
$1,000
$1,898 27,915 $1,448 164 $1,898
27,915
kWh
$1,448
164
kW-months/year
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,847
Cost:
$400
$999 14,696 $848 96 $999
14,696
kWh
$848
96
kW-months/year
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,436
Cost:
$2,500
- - $1,436 163 -
-
kWh
$1,436
163
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,255
Cost:
$200
$663 9,750 $592 67 $663
9,750
kWh
$592
67
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,535
Cost:
$3,823
$1,511 22,216 $1,024 116 $1,511
22,216
kWh
$1,024
116
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$751
Cost:
$300
$751 11,040 - - $751
11,040
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$81,743
Cost:
$12,697
$70,020 1,029,704 $11,723 1,328 $70,020
1,029,704
kWh
$11,723
1,328
kW-months/year
TOTAL IMPLEMENTED Savings:
$42,137
Cost:
$2,614
$35,762 525,917 $6,375 722 $35,762
525,917
kWh
$6,375
722
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand