Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2009 |
Principal Product | Aluminium Ornamental Fences |
NAICS | 332323 - Ornamental and Architectural Metal Work Manufacturing |
SIC | 3446 - Architectural Metal Work |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 440,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $211,872 | 2,932,896 | kWh | $0.07 |
Electricity Demand | $137,053 | 10,193 | kW-months/year | $13.45 |
Natural Gas | $350,400 | 31,326 | MMBtu | $11.19 |
TOTAL ENERGY COSTS | $699,325 | |||
RECOMMENDED SAVINGS* | $84,848 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,989 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $25,233 Cost: $33,000 |
- | - | - | - | $25,233 | 2,255 |
- - kWh |
- - kW-months/year |
$25,233 2,255 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,606 Cost: $1,000 |
$5,001 | 69,456 | $5,605 | 417 | - | - |
$5,001 69,456 kWh |
$5,605 417 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $6,851 Cost: $2,500 |
- | - | $6,851 | 509 | - | - |
- - kWh |
$6,851 509 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,293 Cost: $8,000 |
$2,967 | 41,212 | $3,326 | 247 | - | - |
$2,967 41,212 kWh |
$3,326 247 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,989 Cost: $2,500 |
$3,814 | 26,121 | $175 | 13 | - | - |
$3,814 26,121 kWh |
$175 13 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,929 Cost: $2,000 |
$1,852 | 25,733 | $2,077 | 154 | - | - |
$1,852 25,733 kWh |
$2,077 154 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,326 Cost: $168 |
$1,102 | 15,229 | $1,224 | 91 | - | - |
$1,102 15,229 kWh |
$1,224 91 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $1,311 Cost: $3,200 |
- | - | - | - | $1,311 | 147 |
- - kWh |
- - kW-months/year |
$1,311 147 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,531 Cost: $76,000 |
$9,025 | 117,792 | $9,506 | 707 | - | - |
$9,025 117,792 kWh |
$9,506 707 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,689 Cost: $7,272 |
$882 | 11,700 | $807 | 60 | - | - |
$882 11,700 kWh |
$807 60 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,090 Cost: $1,890 |
$4,090 | 52,985 | - | - | - | - |
$4,090 52,985 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $84,848 Cost: $137,530 |
$28,733 | 360,228 | $29,571 | 2,198 | $26,544 | 2,402 | $28,733 360,228 kWh |
$29,571 2,198 kW-months/year |
$26,544 2,402 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,989 Cost: $90,272 |
$15,573 | 181,346 | $19,416 | 1,443 | - | - | $15,573 181,346 kWh |
$19,416 1,443 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |