IAC Assessment: LE0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2009
Principal Product pharmaceutical
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000,000 Units
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,757 1,295,520 kWh $0.10
Electricity Demand $27,233 2,934 kW-months/year $9.28
Natural Gas $9,415 2,721 MMBtu $3.46
TOTAL ENERGY COSTS $172,405
RECOMMENDED SAVINGS* $75,809 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,787
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,778
Cost:
$20,000
$18,713 207,792 $1,065 115 - - $18,713
207,792
kWh
$1,065
115
kW-months/year
-
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$12,698
Cost:
$2,600
$12,521 119,246 $177 19 - - $12,521
119,246
kWh
$177
19
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,495
Cost:
$11,500
$9,824 93,566 $1,671 180 - - $9,824
93,566
kWh
$1,671
180
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,121
Cost:
$304
$3,574 34,041 $547 59 - - $3,574
34,041
kWh
$547
59
kW-months/year
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,908
Cost:
$12,000
- - - - $3,908 - -
-
kWh
-
-
kW-months/year
$3,908
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,888
Cost:
$2,824
$3,324 31,653 $564 61 - - $3,324
31,653
kWh
$564
61
kW-months/year
-
-
$
07: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$1,380
Cost:
$3,640
$930 8,857 $450 49 - - $930
8,857
kWh
$450
49
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,474
Cost:
$16,830
$7,590 71,575 $1,884 203 - - $7,590
71,575
kWh
$1,884
203
kW-months/year
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,333
Cost:
$6,137
$1,615 15,088 $718 77 - - $1,615
15,088
kWh
$718
77
kW-months/year
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,734
Cost:
$18,122
$5,769 54,051 $965 104 - - $5,769
54,051
kWh
$965
104
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$75,809
Cost:
$93,957
$63,860 635,869 $8,041 867 $3,908 - $63,860
635,869
kWh
$8,041
867
kW-months/year
$3,908
-
$
TOTAL IMPLEMENTED Savings:
$27,787
Cost:
$23,128
$25,611 273,486 $2,176 235 - - $25,611
273,486
kWh
$2,176
235
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost