IAC Assessment: LE0333
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2012
Principal Product Plugs
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 40,000
Annual Production 190,000 Pieces
Production Hrs. Annual 3,120
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,118 700,000 kWh $0.09
Electricity Demand $8,597 1,890 kW-months/year $4.55
Natural Gas $6,738 597 MMBtu $11.29
TOTAL ENERGY COSTS $75,453
RECOMMENDED SAVINGS* $25,241 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,510
Cost:
$7,490
$3,333 38,750 $38 8 - - $139 - $3,333
38,750
kWh
$38
8
kW-months/year
-
-
MMBtu
$139
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,876
Cost:
$12,800
$1,489 17,420 $373 82 - - $14 - $1,489
17,420
kWh
$373
82
kW-months/year
-
-
MMBtu
$14
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,424
Cost:
$1,000
$5,655 65,757 $769 169 - - - - $5,655
65,757
kWh
$769
169
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$1,111
Cost:
$14,190
$1,111 18,016 - - - - - - $1,111
18,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,865
Cost:
$1,000
$1,819 21,150 $46 10 - - - - $1,819
21,150
kWh
$46
10
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$4,369
Cost:
-
- - - - $4,369 387 - - -
-
kWh
-
-
kW-months/year
$4,369
387
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,573
Cost:
$950
$4,181 48,618 $1,392 306 - - - - $4,181
48,618
kWh
$1,392
306
kW-months/year
-
-
MMBtu
-
-
$
08: 2.5194 REDESIGN PROCESS Savings:
$513
Cost:
$5,280
$454 5,281 $59 13 - - - - $454
5,281
kWh
$59
13
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$25,241
Cost:
$42,710
$18,042 214,992 $2,677 588 $4,369 387 $153 - $18,042
214,992
kWh
$2,677
588
kW-months/year
$4,369
387
MMBtu
$153
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost