IAC Assessment: LE0335
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2012
Principal Product Near net shape forgings and butt welded pipe fittings
NAICS 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $50,000,000-$100,000,000
# of Employees 65
Plant Area (Sq.Ft.) 225,000
Annual Production 17,906 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $916,536 7,325,203 kWh $0.13
Electricity Demand $150,774 25,241 kW-months/year $5.97
Natural Gas $1,426,716 170,745 MMBtu $8.36
TOTAL ENERGY COSTS $2,494,026
RECOMMENDED SAVINGS* $1,308,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$1,144,296
Cost:
$10,386,800
- - - - $1,144,296 - - - - - -
-
kWh
-
-
kW-months/year
$1,144,296
-
$
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$67,090
Cost:
$3,825
$9,999 79,694 $57,091 9,563 - - - - - - $9,999
79,694
kWh
$57,091
9,563
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$19,961
Cost:
$32,500
- - $19,961 3,343 - - - - - - -
-
kWh
$19,961
3,343
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$15,946
Cost:
$9,800
$15,946 127,566 - - - - - - - - $15,946
127,566
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,640
Cost:
$1,000
$10,183 81,464 $1,457 244 - - - - - - $10,183
81,464
kWh
$1,457
244
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,534
Cost:
$3,000
- - $7,534 1,262 - - - - - - -
-
kWh
$7,534
1,262
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,018
Cost:
$44,640
$35,535 284,280 $5,086 852 - - - - $397 - $35,535
284,280
kWh
$5,086
852
kW-months/year
-
-
$
-
-
MMBtu
$397
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$516
Cost:
$125
- - - - - - $516 62 - - -
-
kWh
-
-
kW-months/year
-
-
$
$516
62
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,308,001
Cost:
$10,481,690
$71,663 573,004 $91,129 15,264 $1,144,296 - $516 62 $397 - $71,663
573,004
kWh
$91,129
15,264
kW-months/year
$1,144,296
-
$
$516
62
MMBtu
$397
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost