Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2012 |
Principal Product | Near net shape forgings and butt welded pipe fittings |
NAICS | 332996 - Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 225,000 |
Annual Production | 17,906 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $916,536 | 7,325,203 | kWh | $0.13 |
Electricity Demand | $150,774 | 25,241 | kW-months/year | $5.97 |
Natural Gas | $1,426,716 | 170,745 | MMBtu | $8.36 |
TOTAL ENERGY COSTS | $2,494,026 | |||
RECOMMENDED SAVINGS* | $1,308,001 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY |
Savings: $1,144,296 Cost: $10,386,800 |
- | - | - | - | $1,144,296 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,144,296 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $67,090 Cost: $3,825 |
$9,999 | 79,694 | $57,091 | 9,563 | - | - | - | - | - | - |
$9,999 79,694 kWh |
$57,091 9,563 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS |
Savings: $19,961 Cost: $32,500 |
- | - | $19,961 | 3,343 | - | - | - | - | - | - |
- - kWh |
$19,961 3,343 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $15,946 Cost: $9,800 |
$15,946 | 127,566 | - | - | - | - | - | - | - | - |
$15,946 127,566 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,640 Cost: $1,000 |
$10,183 | 81,464 | $1,457 | 244 | - | - | - | - | - | - |
$10,183 81,464 kWh |
$1,457 244 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $7,534 Cost: $3,000 |
- | - | $7,534 | 1,262 | - | - | - | - | - | - |
- - kWh |
$7,534 1,262 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $41,018 Cost: $44,640 |
$35,535 | 284,280 | $5,086 | 852 | - | - | - | - | $397 | - |
$35,535 284,280 kWh |
$5,086 852 kW-months/year |
- - $ |
- - MMBtu |
$397 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $516 Cost: $125 |
- | - | - | - | - | - | $516 | 62 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$516 62 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,308,001 Cost: $10,481,690 |
$71,663 | 573,004 | $91,129 | 15,264 | $1,144,296 | - | $516 | 62 | $397 | - | $71,663 573,004 kWh |
$91,129 15,264 kW-months/year |
$1,144,296 - $ |
$516 62 MMBtu |
$397 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost |