IAC Assessment: LE0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2015
Principal Product Metal Powders
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $50,000,000-$100,000,000
# of Employees 24
Plant Area (Sq.Ft.) 87,786
Annual Production 20,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $934,999 11,277,448 kWh $0.08
Electricity Demand $109,079 25,381 kW-months/year $4.30
Electricity Fees $309,726 - $ -
Natural Gas $122,366 15,234 MMBtu $8.03
TOTAL ENERGY COSTS $1,476,170
RECOMMENDED SAVINGS* $237,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$16,723
Cost:
$28
$15,614 188,120 $1,109 258 - - - - $15,614
188,120
kWh
$1,109
258
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,648
Cost:
$512
$7,215 86,933 $433 101 - - - - $7,215
86,933
kWh
$433
101
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,673
Cost:
$1,000
$5,183 62,443 $490 114 - - - - $5,183
62,443
kWh
$490
114
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$8,953
Cost:
$1,920
- - - - $8,953 1,115 - - -
-
kWh
-
-
kW-months/year
$8,953
1,115
MMBtu
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$30,027
Cost:
$5,000
$(-6,978) (-84,075) $(-495) (-115) - - $37,500 - $(-6,978)
(-84,075)
kWh
$(-495)
(-115)
kW-months/year
-
-
MMBtu
$37,500
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$27,922
Cost:
$10,500
$26,103 314,496 $1,819 423 - - - - $26,103
314,496
kWh
$1,819
423
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,457
Cost:
$3,025
- - $5,457 1,269 - - - - -
-
kWh
$5,457
1,269
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,074
Cost:
$35,000
$24,341 293,268 $1,733 403 - - - - $24,341
293,268
kWh
$1,733
403
kW-months/year
-
-
MMBtu
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,334
Cost:
$16,500
$13,706 165,132 $1,281 298 $(-5,653) (-704) - - $13,706
165,132
kWh
$1,281
298
kW-months/year
$(-5,653)
(-704)
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,729
Cost:
$48,067
$20,284 244,390 $1,445 336 - - - - $20,284
244,390
kWh
$1,445
336
kW-months/year
-
-
MMBtu
-
-
$
11: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$42,371
Cost:
$95,000
$39,554 476,559 $2,817 655 - - - - $39,554
476,559
kWh
$2,817
655
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,188
Cost:
$5,469
$1,871 22,543 $26 6 - - $291 - $1,871
22,543
kWh
$26
6
kW-months/year
-
-
MMBtu
$291
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,886
Cost:
$69,160
$16,699 201,190 $1,187 276 - - - - $16,699
201,190
kWh
$1,187
276
kW-months/year
-
-
MMBtu
-
-
$
14: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,902
Cost:
$24,000
- - - - $5,902 735 - - -
-
kWh
-
-
kW-months/year
$5,902
735
MMBtu
-
-
$
15: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,678
Cost:
$6,940
$1,650 19,877 $28 7 - - - - $1,650
19,877
kWh
$28
7
kW-months/year
-
-
MMBtu
-
-
$
16: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,312
Cost:
$35,000
$7,589 91,436 $722 168 - - - - $7,589
91,436
kWh
$722
168
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$237,877
Cost:
$357,121
$172,832 2,082,312 $18,052 4,198 $9,202 1,146 $37,791 - $172,832
2,082,312
kWh
$18,052
4,198
kW-months/year
$9,202
1,146
MMBtu
$37,791
-
$
TOTAL IMPLEMENTED Savings:
$102,530
Cost:
$209,701
$89,811 1,082,064 $12,178 2,832 $249 31 $291 - $89,811
1,082,064
kWh
$12,178
2,832
kW-months/year
$249
31
MMBtu
$291
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost