IAC logo
IAC Assessment: LE0470
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0470
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2019
Principal Product Flexible Packaging
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $100,000,000-$500,000,000
# of Employees 123
Plant Area (Sq.Ft.) 250,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,133,586 20,193,600 kWh $0.06
Electricity Demand $101,940 40,026 kW-months/year $2.55
Electricity Fees $28,968 - $ -
Natural Gas $523,324 122,764 MMBtu $4.26
TOTAL ENERGY COSTS $1,787,818
RECOMMENDED SAVINGS* $352,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$4,000
Cost:
-
- - - - $4,000 - -
-
kWh
-
-
kW-months/year
$4,000
-
$
02: 3.1194 USE AUTOMATIC FLOW CONTROL Savings:
$20,000
Cost:
$6,500
- - - - $20,000 - -
-
kWh
-
-
kW-months/year
$20,000
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$25,833
Cost:
$35,000
$24,602 439,316 $1,231 483 - - $24,602
439,316
kWh
$1,231
483
kW-months/year
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,332
Cost:
$25,000
$8,792 156,994 $1,540 604 - - $8,792
156,994
kWh
$1,540
604
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,769
Cost:
$115,000
$21,627 386,190 $2,142 840 - - $21,627
386,190
kWh
$2,142
840
kW-months/year
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$268,493
Cost:
$1,534,575
$252,688 4,512,293 $15,805 6,198 - - $252,688
4,512,293
kWh
$15,805
6,198
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$352,427
Cost:
$1,716,075
$307,709 5,494,793 $20,718 8,125 $24,000 - $307,709
5,494,793
kWh
$20,718
8,125
kW-months/year
$24,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes