IAC Assessment: LE0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2020
Principal Product Steel Storage Tanks
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 23
Plant Area (Sq.Ft.) 120,000
Annual Production 100 Units
Production Hrs. Annual 4,212
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,855 2,084,050 kWh $0.07
Electricity Demand $22,380 7,967 kW-months/year $2.81
Electricity Fees $6,917 - $ -
Natural Gas $72,503 7,252 MMBtu $10.00
Fuel Oil #1 $11,310 561 MMBtu $20.16
Fuel Oil #2 $9,094 546 MMBtu $16.66
TOTAL ENERGY COSTS $258,059
RECOMMENDED SAVINGS* $45,472 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,382
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$3,081
Cost:
$48
$2,744 42,218 $337 120 - - - - $2,744
42,218
kWh
$337
120
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,293
Cost:
$12,000
$5,970 91,841 $1,323 471 - - - - $5,970
91,841
kWh
$1,323
471
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,609
Cost:
$10,500
$5,106 78,554 $503 179 - - - - $5,106
78,554
kWh
$503
179
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,208
Cost:
$8,000
$3,444 52,986 $764 272 - - - - $3,444
52,986
kWh
$764
272
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,400
Cost:
$12,000
- - - - $5,400 540 - - -
-
kWh
-
-
kW-months/year
$5,400
540
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,668
Cost:
$21,820
$7,803 120,042 $865 308 - - - - $7,803
120,042
kWh
$865
308
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$9,314
Cost:
$30,000
- - - - - - $9,314 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,314
-
$
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,899
Cost:
$7,200
$1,697 26,112 $202 72 - - - - $1,697
26,112
kWh
$202
72
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$45,472
Cost:
$101,568
$26,764 411,753 $3,994 1,422 $5,400 540 $9,314 - $26,764
411,753
kWh
$3,994
1,422
kW-months/year
$5,400
540
MMBtu
$9,314
-
$
TOTAL IMPLEMENTED Savings:
$23,382
Cost:
$63,820
$7,803 120,042 $865 308 $5,400 540 $9,314 - $7,803
120,042
kWh
$865
308
kW-months/year
$5,400
540
MMBtu
$9,314
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes