IAC logo
IAC Assessment: LL0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2001
Principal Product Steel castings
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 212,000
Annual Production 4,800 Tons
Production Hrs. Annual 2,400
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $701,322 10,284,101 kWh $0.07
Electricity Demand $289,201 141,573 kW-months/year $2.04
Electricity Fees $10,583 - $ -
Natural Gas $782,501 163,670 MMBtu $4.78
TOTAL ENERGY COSTS $1,856,624
RECOMMENDED SAVINGS* $156,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,785
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$22,921
Cost:
$4,950
$22,039 323,917 - - $882 - - - - - $22,039
323,917
kWh
-
-
kW-months/year
$882
-
$
-
-
MMBtu
-
-
lb
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$36,284
Cost:
$19,204
- - - - - - $36,284 7,314 - - -
-
kWh
-
-
kW-months/year
-
-
$
$36,284
7,314
MMBtu
-
-
lb
03: 2.7145 INSTALL SKYLIGHTS Savings:
$8,387
Cost:
$13,894
$6,448 132,000 $1,616 792 $323 - - - - - $6,448
132,000
kWh
$1,616
792
kW-months/year
$323
-
$
-
-
MMBtu
-
-
lb
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$45,054
Cost:
$173,974
- - $43,321 21,236 $1,733 - - - - - -
-
kWh
$43,321
21,236
kW-months/year
$1,733
-
$
-
-
MMBtu
-
-
lb
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$43,810
Cost:
-
- - - - - - - - $43,810 3,240 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$43,810
3,240
lb
TOTAL RECOMMENDED Savings:
$156,456
Cost:
$212,022
$28,487 455,917 $44,937 22,028 $2,938 - $36,284 7,314 $43,810 3,240 $28,487
455,917
kWh
$44,937
22,028
kW-months/year
$2,938
-
$
$36,284
7,314
MMBtu
$43,810
3,240
lb
TOTAL IMPLEMENTED Savings:
$111,785
Cost:
$178,924
$22,039 323,917 $43,321 21,236 $2,615 - - - $43,810 3,240 $22,039
323,917
kWh
$43,321
21,236
kW-months/year
$2,615
-
$
-
-
MMBtu
$43,810
3,240
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)