IAC logo
IAC Assessment: LL0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2001
Principal Product Valves
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 371
Plant Area (Sq.Ft.) 180,000
Annual Production 25,000 Pieces
Production Hrs. Annual 4,160
Location (State) LA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,128,028 19,758,000 kWh $0.06
Electricity Demand $307,208 41,797 kW-months/year $7.35
Electricity Fees $51,409 - $ -
Natural Gas $70,204 18,764 MMBtu $3.74
TOTAL ENERGY COSTS $1,640,323
RECOMMENDED SAVINGS* $801,101 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $801,101
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Other Liquid (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$537,467
Cost:
$121,200
$516,796 9,034,889 - - $20,671 - - - - - $516,796
9,034,889
kWh
-
-
kW-months/year
$20,671
-
$
-
-
MMBtu
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$126,949
Cost:
$31,740
$122,066 2,134,022 - - $4,883 - - - - - $122,066
2,134,022
kWh
-
-
kW-months/year
$4,883
-
$
-
-
MMBtu
-
-
gal
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$4,948
Cost:
$406
$3,472 60,703 $1,286 175 $190 - - - - - $3,472
60,703
kWh
$1,286
175
kW-months/year
$190
-
$
-
-
MMBtu
-
-
gal
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,399
Cost:
$203
$1,682 29,403 $625 85 $92 - - - - - $1,682
29,403
kWh
$625
85
kW-months/year
$92
-
$
-
-
MMBtu
-
-
gal
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$45,864
Cost:
$112,325
- - $44,100 6,000 $1,764 - - - - - -
-
kWh
$44,100
6,000
kW-months/year
$1,764
-
$
-
-
MMBtu
-
-
gal
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$83,474
Cost:
$92,279
- - - - - - $26,474 1,430 $57,000 150,000 -
-
kWh
-
-
kW-months/year
-
-
$
$26,474
1,430
MMBtu
$57,000
150,000
gal
TOTAL RECOMMENDED Savings:
$801,101
Cost:
$358,153
$644,016 11,259,017 $46,011 6,260 $27,600 - $26,474 1,430 $57,000 150,000 $644,016
11,259,017
kWh
$46,011
6,260
kW-months/year
$27,600
-
$
$26,474
1,430
MMBtu
$57,000
150,000
gal
TOTAL IMPLEMENTED Savings:
$801,101
Cost:
$358,153
$644,016 11,259,017 $46,011 6,260 $27,600 - $26,474 1,430 $57,000 150,000 $644,016
11,259,017
kWh
$46,011
6,260
kW-months/year
$27,600
-
$
$26,474
1,430
MMBtu
$57,000
150,000
gal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Other Liquid (non-haz) Electricity Usage Electricity Demand Electricity Fees Fuel Oil #1 Other Liquid (non-haz)