IAC logo
IAC Assessment: LL0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2002
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 2,500,000
Annual Production 145,393,976 Pieces
Production Hrs. Annual 4,420
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $917,724 21,752,500 kWh $0.04
Electricity Demand $363,684 49,298 kW-months/year $7.38
Electricity Fees $51,185 - $ -
TOTAL ENERGY COSTS $1,332,593
RECOMMENDED SAVINGS* $235,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $214,919
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$189,217
Cost:
-
- - $181,939 24,720 $7,278 - -
-
kWh
$181,939
24,720
kW-months/year
$7,278
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,007
Cost:
$2,985
$15,391 364,283 - - $616 - $15,391
364,283
kWh
-
-
kW-months/year
$616
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,140
Cost:
$23,730
- - $14,558 1,978 $582 - -
-
kWh
$14,558
1,978
kW-months/year
$582
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,695
Cost:
$1,485
$9,322 220,663 - - $373 - $9,322
220,663
kWh
-
-
kW-months/year
$373
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,273
Cost:
-
$2,507 59,345 $640 87 $126 - $2,507
59,345
kWh
$640
87
kW-months/year
$126
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,062
Cost:
$51
$1,770 41,891 $213 29 $79 - $1,770
41,891
kWh
$213
29
kW-months/year
$79
-
$
TOTAL RECOMMENDED Savings:
$235,394
Cost:
$28,251
$28,990 686,182 $197,350 26,814 $9,054 - $28,990
686,182
kWh
$197,350
26,814
kW-months/year
$9,054
-
$
TOTAL IMPLEMENTED Savings:
$214,919
Cost:
$4,470
$24,713 584,946 $181,939 24,720 $8,267 - $24,713
584,946
kWh
$181,939
24,720
kW-months/year
$8,267
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees