Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2003 |
Principal Product | Nitro-paraffin and derivatives |
NAICS | 325180 - Other Basic Inorganic Chemical Manufacturing |
SIC | 2890 - |
Sales | $100,000,000-$500,000,000 |
# of Employees | 179 |
Plant Area (Sq.Ft.) | 2,178,000 |
Annual Production | 85,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,748,024 | 53,390,100 | kWh | $0.05 |
Electricity Demand | $179,431 | 13,129 | kW-months/year | $13.67 |
Electricity Fees | $122,039 | - | $ | - |
Natural Gas | $4,466,254 | 1,664,676 | MMBtu | $2.68 |
TOTAL ENERGY COSTS | $7,515,748 | |||
RECOMMENDED SAVINGS* | $3,238,239 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,272,728 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $944,111 Cost: $379,982 |
- | - | - | - | $944,111 | 198,744 |
- - kWh |
- - $ |
$944,111 198,744 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $918,298 Cost: $3,111,056 |
$3,201,771 | 47,358,990 | - | - | $(-2,283,473) | (-545,200) |
$3,201,771 47,358,990 kWh |
- - $ |
$(-2,283,473) (-545,200) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $847,706 Cost: $1,220 |
- | - | - | - | $847,706 | 194,535 |
- - kWh |
- - $ |
$847,706 194,535 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $103,102 Cost: - |
- | - | - | - | $103,102 | 37,492 |
- - kWh |
- - $ |
$103,102 37,492 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $49,634 Cost: $3,890 |
- | - | - | - | $49,634 | 4,566 |
- - kWh |
- - $ |
$49,634 4,566 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $32,003 Cost: $5,479 |
$30,772 | 514,933 | $1,231 | - | - | - |
$30,772 514,933 kWh |
$1,231 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $343,385 Cost: $3,840 |
- | - | - | - | $343,385 | 124,867 |
- - kWh |
- - $ |
$343,385 124,867 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,238,239 Cost: $3,505,467 |
$3,232,543 | 47,873,923 | $1,231 | - | $4,465 | 15,004 | $3,232,543 47,873,923 kWh |
$1,231 - $ |
$4,465 15,004 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,272,728 Cost: $14,429 |
$30,772 | 514,933 | $1,231 | - | $1,240,725 | 323,968 | $30,772 514,933 kWh |
$1,231 - $ |
$1,240,725 323,968 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |