IAC Assessment: LL0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Flow control valves
NAICS 324110 - Petroleum Refineries
SIC 2911 - Petroleum Refining
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 30,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,500
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,220 675,400 kWh $0.05
Electricity Demand $14,972 2,664 kW-months/year $5.62
Electricity Fees $2,516 - $ -
Natural Gas $79 11 MMBtu $7.18
TOTAL ENERGY COSTS $50,787
RECOMMENDED SAVINGS* $16,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$10,856
Cost:
$4,436
$10,319 209,788 - - $537 - - - - - $10,319
209,788
kWh
-
-
kW-months/year
$537
-
$
-
-
$
-
-
$
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,828
Cost:
$770
$1,738 35,332 - - $90 - - - - - $1,738
35,332
kWh
-
-
kW-months/year
$90
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,184
Cost:
$345
$653 13,279 $472 84 $59 - - - - - $653
13,279
kWh
$472
84
kW-months/year
$59
-
$
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$599
Cost:
$158
$569 11,574 - - $30 - - - - - $569
11,574
kWh
-
-
kW-months/year
$30
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$583
Cost:
$560
$554 11,258 - - $29 - - - - - $554
11,258
kWh
-
-
kW-months/year
$29
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$474
Cost:
$15
$277 5,639 $174 31 $23 - - - - - $277
5,639
kWh
$174
31
kW-months/year
$23
-
$
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$439
Cost:
$598
$417 8,481 - - $22 - - - - - $417
8,481
kWh
-
-
kW-months/year
$22
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$571
Cost:
$420
$197 3,995 - - $10 - $218 - $146 - $197
3,995
kWh
-
-
kW-months/year
$10
-
$
$218
-
$
$146
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$106
Cost:
$130
$101 2,053 - - $5 - - - - - $101
2,053
kWh
-
-
kW-months/year
$5
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,640
Cost:
$7,432
$14,825 301,399 $646 115 $805 - $218 - $146 - $14,825
301,399
kWh
$646
115
kW-months/year
$805
-
$
$218
-
$
$146
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost