IAC Assessment: LL0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Rotating Machinery
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 45,000
Annual Production 500 Pieces
Production Hrs. Annual 4,160
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,296 1,377,231 kWh $0.05
Electricity Demand $18,653 3,319 kW-months/year $5.62
Electricity Fees $4,745 - $ -
Natural Gas $5,588 707 MMBtu $7.90
TOTAL ENERGY COSTS $99,282
RECOMMENDED SAVINGS* $25,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,137
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$17,499
Cost:
$7,098
$17,572 344,275 - - $937 - $(-1,010) - $17,572
344,275
kWh
-
-
kW-months/year
$937
-
$
$(-1,010)
-
$
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,785
Cost:
$880
$3,593 70,400 - - $192 - - - $3,593
70,400
kWh
-
-
kW-months/year
$192
-
$
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,515
Cost:
$763
- - $1,457 192 $58 - - - -
-
kWh
$1,457
192
kW-months/year
$58
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$582
Cost:
$28
$408 7,989 $152 27 $22 - - - $408
7,989
kWh
$152
27
kW-months/year
$22
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$443
Cost:
$360
$421 8,251 - - $22 - - - $421
8,251
kWh
-
-
kW-months/year
$22
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$384
Cost:
$56
$240 4,692 $129 23 $15 - - - $240
4,692
kWh
$129
23
kW-months/year
$15
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$386
Cost:
$280
$136 2,663 - - $7 - $243 - $136
2,663
kWh
-
-
kW-months/year
$7
-
$
$243
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$430
Cost:
$32
- - - - - - $430 - -
-
kWh
-
-
kW-months/year
-
-
$
$430
-
$
TOTAL RECOMMENDED Savings:
$25,024
Cost:
$9,497
$22,370 438,270 $1,738 242 $1,253 - $(-337) - $22,370
438,270
kWh
$1,738
242
kW-months/year
$1,253
-
$
$(-337)
-
$
TOTAL IMPLEMENTED Savings:
$5,137
Cost:
$1,244
$4,377 85,744 $281 50 $236 - $243 - $4,377
85,744
kWh
$281
50
kW-months/year
$236
-
$
$243
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes