IAC logo
IAC Assessment: LL0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Oilfield service equipment
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 25,000
Annual Production 28,000 Pieces
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,568 1,275,200 kWh $0.05
Electricity Demand $16,264 2,894 kW-months/year $5.62
Electricity Fees $3,997 - $ -
Natural Gas $1,261 113 MMBtu $11.16
TOTAL ENERGY COSTS $87,090
RECOMMENDED SAVINGS* $11,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,715
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,838
Cost:
$903
$3,353 65,203 $1,259 224 $226 - - - - - $3,353
65,203
kWh
$1,259
224
kW-months/year
$226
-
$
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,621
Cost:
$192
$2,106 40,948 $393 70 $122 - - - - - $2,106
40,948
kWh
$393
70
kW-months/year
$122
-
$
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,009
Cost:
$1,200
$377 7,323 - - $18 - - - $1,614 - $377
7,323
kWh
-
-
kW-months/year
$18
-
$
-
-
lb
$1,614
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$590
Cost:
$112
$411 7,989 $152 27 $27 - - - - - $411
7,989
kWh
$152
27
kW-months/year
$27
-
$
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$278
Cost:
$80
$265 5,150 - - $13 - - - - - $265
5,150
kWh
-
-
kW-months/year
$13
-
$
-
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,000
Cost:
-
- - - - - - $1,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,000
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,336
Cost:
$2,487
$6,512 126,613 $1,804 321 $406 - $1,000 - $1,614 - $6,512
126,613
kWh
$1,804
321
kW-months/year
$406
-
$
$1,000
-
lb
$1,614
-
$
TOTAL IMPLEMENTED Savings:
$8,715
Cost:
$2,295
$4,406 85,665 $1,411 251 $284 - $1,000 - $1,614 - $4,406
85,665
kWh
$1,411
251
kW-months/year
$284
-
$
$1,000
-
lb
$1,614
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes