IAC logo
IAC Assessment: LL0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product Oil and Gas field equipment
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 45,000
Annual Production 24 Pieces
Production Hrs. Annual 6,240
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,339 1,725,289 kWh $0.06
Electricity Demand $32,130 5,691 kW-months/year $5.65
Electricity Fees $10,548 - $ -
Natural Gas $60,436 9,363 MMBtu $6.45
TOTAL ENERGY COSTS $198,453
RECOMMENDED SAVINGS* $84,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,447
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$37,447
Cost:
$4,522
- - - - - - $37,447 5,806 - - -
-
kWh
-
-
kW-months/year
-
-
$
$37,447
5,806
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$24,382
Cost:
$3,930
$22,513 407,400 - - $1,869 - - - - - $22,513
407,400
kWh
-
-
kW-months/year
$1,869
-
$
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,505
Cost:
$575
$6,565 118,797 $1,288 228 $652 - - - - - $6,565
118,797
kWh
$1,288
228
kW-months/year
$652
-
$
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,939
Cost:
$2,840
$3,637 65,823 - - $302 - - - - - $3,637
65,823
kWh
-
-
kW-months/year
$302
-
$
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,428
Cost:
$30
$2,148 38,876 $1,017 180 $263 - - - - - $2,148
38,876
kWh
$1,017
180
kW-months/year
$263
-
$
-
-
MMBtu
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,554
Cost:
$480
$1,435 25,965 - - $119 - - - - - $1,435
25,965
kWh
-
-
kW-months/year
$119
-
$
-
-
MMBtu
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,473
Cost:
$510
$1,360 24,619 - - $113 - - - - - $1,360
24,619
kWh
-
-
kW-months/year
$113
-
$
-
-
MMBtu
-
-
$
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,118
Cost:
$48
$1,032 18,670 - - $86 - - - - - $1,032
18,670
kWh
-
-
kW-months/year
$86
-
$
-
-
MMBtu
-
-
$
09: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,500
Cost:
$60
- - - - - - - - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,500
-
$
TOTAL RECOMMENDED Savings:
$84,346
Cost:
$12,995
$38,690 700,150 $2,305 408 $3,404 - $37,447 5,806 $2,500 - $38,690
700,150
kWh
$2,305
408
kW-months/year
$3,404
-
$
$37,447
5,806
MMBtu
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$37,447
Cost:
$4,522
- - - - - - $37,447 5,806 - - -
-
kWh
-
-
kW-months/year
-
-
$
$37,447
5,806
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost