IAC Assessment: LL0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product Plate Glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 185,000
Annual Production 130,000 Pieces
Production Hrs. Annual 6,240
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $267,279 5,702,465 kWh $0.05
Electricity Demand $178,713 22,236 kW-months/year $8.04
Electricity Fees $31,763 - $ -
Natural Gas $5,966 587 MMBtu $10.16
TOTAL ENERGY COSTS $483,721
RECOMMENDED SAVINGS* $94,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,214
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$52,925
Cost:
$8,000
$49,416 1,054,310 - - $3,509 - - - - - $49,416
1,054,310
kWh
-
-
kW-months/year
$3,509
-
$
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$27,961
Cost:
$1,024
$26,107 557,003 - - $1,854 - - - - - $26,107
557,003
kWh
-
-
kW-months/year
$1,854
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,878
Cost:
$2,070
$3,471 74,056 $1,084 143 $323 - - - - - $3,471
74,056
kWh
$1,084
143
kW-months/year
$323
-
$
-
-
$
-
-
$
04: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,630
Cost:
$264
$2,456 52,398 - - $174 - - - - - $2,456
52,398
kWh
-
-
kW-months/year
$174
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,563
Cost:
$30
$1,065 22,731 $394 52 $104 - - - - - $1,065
22,731
kWh
$394
52
kW-months/year
$104
-
$
-
-
$
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$846
Cost:
$90
$790 16,845 - - $56 - - - - - $790
16,845
kWh
-
-
kW-months/year
$56
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$635
Cost:
$240
$593 12,647 - - $42 - - - - - $593
12,647
kWh
-
-
kW-months/year
$42
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$411
Cost:
$350
$156 3,329 - - $11 - $122 - $122 - $156
3,329
kWh
-
-
kW-months/year
$11
-
$
$122
-
$
$122
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$389
Cost:
$120
$363 7,752 - - $26 - - - - - $363
7,752
kWh
-
-
kW-months/year
$26
-
$
-
-
$
-
-
$
10: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,500
Cost:
$60
- - - - - - - - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$2,500
-
$
TOTAL RECOMMENDED Savings:
$94,738
Cost:
$12,248
$84,417 1,801,071 $1,478 195 $6,099 - $122 - $2,622 - $84,417
1,801,071
kWh
$1,478
195
kW-months/year
$6,099
-
$
$122
-
$
$2,622
-
$
TOTAL IMPLEMENTED Savings:
$65,214
Cost:
$11,194
$57,245 1,221,337 $1,084 143 $4,141 - $122 - $2,622 - $57,245
1,221,337
kWh
$1,084
143
kW-months/year
$4,141
-
$
$122
-
$
$2,622
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost