IAC logo
IAC Assessment: LL0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product Plastic Bags
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 350,000
Annual Production 152,000,000 Pounds
Production Hrs. Annual 8,664
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,602,557 35,046,400 kWh $0.05
Electricity Demand $414,157 56,524 kW-months/year $7.33
Electricity Fees $158,598 - $ -
TOTAL ENERGY COSTS $2,175,312
RECOMMENDED SAVINGS* $156,870 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $144,713
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$118,511
Cost:
$3,400
$109,834 2,401,791 - - $8,677 - - - $109,834
2,401,791
kWh
-
-
kW-months/year
$8,677
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,033
Cost:
$25,871
- - $16,033 - - - - - -
-
kWh
$16,033
-
kW-months/year
-
-
$
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$12,157
Cost:
$1,671
$11,267 246,383 - - $890 - - - $11,267
246,383
kWh
-
-
kW-months/year
$890
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,526
Cost:
$390
$3,433 75,065 $762 104 $331 - - - $3,433
75,065
kWh
$762
104
kW-months/year
$331
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$195
Cost:
$135
- - - - $195 - - - -
-
kWh
-
-
kW-months/year
$195
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$468
Cost:
$350
$152 3,329 - - $12 - $304 - $152
3,329
kWh
-
-
kW-months/year
$12
-
$
$304
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,980
Cost:
$1,684
- - - - - - $4,980 - -
-
kWh
-
-
kW-months/year
-
-
$
$4,980
-
$
TOTAL RECOMMENDED Savings:
$156,870
Cost:
$33,501
$124,686 2,726,568 $16,795 104 $10,105 - $5,284 - $124,686
2,726,568
kWh
$16,795
104
kW-months/year
$10,105
-
$
$5,284
-
$
TOTAL IMPLEMENTED Savings:
$144,713
Cost:
$31,830
$113,419 2,480,185 $16,795 104 $9,215 - $5,284 - $113,419
2,480,185
kWh
$16,795
104
kW-months/year
$9,215
-
$
$5,284
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes